Sewer and plumbing repairs permitted at 2003 Paramount Ave
A City of Austin permit filed June 6, 2026, covers repairs to the collapsed sewer line beneath the home at 2003 Paramount Ave. The work includes installing a sewage ejector pump for the kitchen sink and laundry tub, plus replacing piping for both bathrooms through a tunnel under the front of the house.
Summarized from City of Austin records · updated Jun 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 6, 2026
- since Jun 6, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectFixing collapsed sewer line under house by installing sewage ejector pump in rear of home that the kitchen sink and laundry tub will tie onto then doing tunnel job under front section of house to replace piping for both bathrooms
Fixing collapsed sewer line under house by installing sewage ejector pump in rear of home that the kitchen sink and laundry tub will tie onto then doing tunnel job under front section of house to replace piping for both bathrooms
City of Austin permitPlumbing PermitFinal- Record
- 2026-071490 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2003 Paramount Ave
What is being built at 2003 Paramount Ave?
The June 6, 2026, City of Austin permit describes sewer and plumbing repairs at a home, not a new building.
Is a restaurant opening at 2003 Paramount Ave?
The listed permit does not describe a restaurant opening. It is a plumbing permit for sewer and pipe repairs at a home.
What work does permit 2026-071490 PP cover?
It covers a sewage ejector pump for the kitchen sink and laundry tub, along with piping replacement for both bathrooms.
When was the plumbing permit filed for 2003 Paramount Ave?
The City of Austin permit, number 2026-071490 PP, was filed June 6, 2026, and its status is listed as Final.
Is the sewer line being repaired at 2003 Paramount Ave?
Yes. The permit description says the collapsed sewer line beneath the house will be addressed, including a tunnel under the front section to replace piping for both bathrooms.
Will the kitchen sink and laundry tub connect to a new pump?
The permit description says both the kitchen sink and laundry tub will tie onto a sewage ejector pump installed at the rear of the home.
Also being built nearby
All of 78704- 2005 Paramount AveAug 5, 2025Excavating 30ft tunnel to make drain line repairs · 32 m away
- 2004 Ann Arbor AveApr 17, 2025Replacement of complete existing central heat and air system with or without duct work 2.5t-gas-14s-ss (unit 2) · 43 m away
- 2000 Paramount AveOct 29, 2026Eplan: residential expedited review - new autofill/heated pool · 56 m away
- 2002 Paramount AveApr 21, 2025Construct new driveway approach of 16. 98 ft ***no sidewalk inspection per bp · 57 m away
- 2006 Ann Arbor AveFeb 6, 2026Demolition old driveway. construct new driveway approach of 23 ft · 63 m away
- 2009 Paramount AveAug 5, 2026New irrigation system · 74 m away
- 1912 Paramount AveMay 23, 2025Add sub panel in back yard. add power for co-plunge tub and sauna. add power for new mini split system in garage · 75 m away
- 1907 Paramount AveJul 17, 2026Remove uncovered wood deck and replacing with new deck pergola and covered screen porch removing existing uncovered wood deck and replacing with new deck and patio addition · 78 m away
- 2008 Paramount AveSep 28, 2007H. e. cadwallader subd., amended plat of lots 8a & 21a, — h. e. cadwallader subd., amended plat of lots 8a & 21a · 107 m away
- 2100 Paramount AveAug 19, 2025Upgrading existing overhead service meter riser panel grounding and surge · 120 m away
- 2003 Rabb RdJun 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton vertical gas system · 127 m away
- 1900 Paramount AveJan 23, 2025(hernandez hector) - installation of circuit for elec. vehicle charging station - esip · 133 m away