2004 Ann Arbor Ave
Austin, TX 78704
2004 Ann Arbor Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 2004 Ann Arbor Ave, Austin, TX 78704. The most recent, filed April 17, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work 2.5t-gas-14s-ss (unit 2)”.
Compiled from City of Austin records · updated Apr 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 17, 2025
- since Apr 17, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work 2.5t-gas-14s-ss (unit 2)
- AppliedApr 9, 2025
- IssuedApr 17, 2025
- WorkApr '25 – Apr '25
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work 2.5t-gas-14s-ss (unit 2)
Replacement of complete existing central heat and air system with or without duct work 2.5t-gas-14s-ss (unit 2)
City of Austin permitMechanical PermitFinal- Record
- 2025-043125 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2004 Ann Arbor Ave
What is being built at 2004 Ann Arbor Ave?
The latest filing (City of Austin permit 2025-043125 MP, April 17, 2025) covers replacement of complete existing central heat and air system with or without duct work 2.5t-gas-14s-ss (unit 2).
How many permits and filings does 2004 Ann Arbor Ave have?
1 filing across 1 project, from April 17, 2025 to April 17, 2025.
Is there other construction near 2004 Ann Arbor Ave?
Yes. Nearby filings include 2006 Ann Arbor Ave (demolition old driveway. construct new driveway approach of 23 ft, Feb 6, 2026); 2005 Paramount Ave (excavating 30ft tunnel to make drain line repairs, Aug 5, 2025); 2003 Paramount Ave (fixing collapsed sewer line under house by installing sewage ejector pump in rear of home that the kitchen sink and laundry tub will tie onto then doing tunnel job under front section of house to replace piping for both bathrooms, Jun 6, 2026).
How do I get alerts for new permits at 2004 Ann Arbor Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2006 Ann Arbor AveFeb 6, 2026Demolition old driveway. construct new driveway approach of 23 ft · 24 m away
- 2005 Paramount AveAug 5, 2025Excavating 30ft tunnel to make drain line repairs · 40 m away
- 2003 Paramount AveJun 6, 2026Fixing collapsed sewer line under house by installing sewage ejector pump in rear of home that the kitchen sink and laundry tub will tie onto then doing tunnel job under front section of house to replace piping for both bathrooms · 43 m away
- 2009 Paramount AveAug 5, 2026New irrigation system · 64 m away
- 2002 Paramount AveApr 21, 2025Construct new driveway approach of 16. 98 ft ***no sidewalk inspection per bp · 93 m away
- 2000 Paramount AveOct 29, 2026Eplan: residential expedited review - new autofill/heated pool · 99 m away
- 1907 Paramount AveJul 17, 2026Remove uncovered wood deck and replacing with new deck pergola and covered screen porch removing existing uncovered wood deck and replacing with new deck and patio addition · 108 m away
- 1912 Paramount AveMay 23, 2025Add sub panel in back yard. add power for co-plunge tub and sauna. add power for new mini split system in garage · 118 m away
- 2008 Paramount AveSep 28, 2007H. e. cadwallader subd., amended plat of lots 8a & 21a, — h. e. cadwallader subd., amended plat of lots 8a & 21a · 123 m away
- 2100 Paramount AveAug 19, 2025Upgrading existing overhead service meter riser panel grounding and surge · 129 m away
- 2105 Ann Arbor AveSep 11, 2025Construct new driveway approach of 12 ft and curb & gutter of 15 ft. fee in lieu of sidewalk paid · 133 m away
- 2015 Holland AveJan 13, 2026Eplan: residential expedited review - new construction of a two-unit res. unit 2 2-story [4 bed - 3.5 bath] with attached carport · 136 m away