groundranger
Recent · latest filing Aug 2025Residential

2005 Paramount Ave

Austin, TX 78704

2005 Paramount Ave: 3 projects on record

City of Austin lists 3 filings across 3 projects at 2005 Paramount Ave, Austin, TX 78704 since April 14, 2025. The most recent, filed August 5, 2025, covers: “Excavating 30ft tunnel to make drain line repairs”.

Compiled from City of Austin records · updated Aug 5, 2025

Projects
3
3 filings
Latest filing
Aug 5, 2025
since Apr 14, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Excavating 30ft tunnel to make drain line repairs

    Excavating 30ft tunnel to make drain line repairs

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of 9 solar panels with 1 solaredge inverter

    Installation of 9 solar panels with 1 solaredge inverter

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Temporary disconnect/ reconnection and upgrade to replace load center for 3.69kw roof mounted solar system

    Temporary disconnect/ reconnection and upgrade to replace load center for 3.69kw roof mounted solar system

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2005 Paramount Ave

What is being built at 2005 Paramount Ave?

The latest filing (City of Austin permit 2025-096957 PP, August 5, 2025) covers excavating 30ft tunnel to make drain line repairs.

How many permits and filings does 2005 Paramount Ave have?

3 filings across 3 projects, from April 14, 2025 to August 5, 2025.

Is there other construction near 2005 Paramount Ave?

Yes. Nearby filings include 2003 Paramount Ave (fixing collapsed sewer line under house by installing sewage ejector pump in rear of home that the kitchen sink and laundry tub will tie onto then doing tunnel job under front section of house to replace piping for both bathrooms, Jun 6, 2026); 2004 Ann Arbor Ave (replacement of complete existing central heat and air system with or without duct work 2.5t-gas-14s-ss (unit 2), Apr 17, 2025); 2009 Paramount Ave (new irrigation system, Aug 5, 2026).

How do I get alerts for new permits at 2005 Paramount Ave?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78704

More solar installs in 78704.

Get alerts for 2005 Paramount Ave