2009 Barton Pkwy

Austin, TX 78704

New pool and spa permitted at 2009 Barton Pkwy

A new 189-square-foot pool and 33-square-foot spa, with concrete decking and walls, are planned at 2009 Barton Pkwy. The City of Austin issued an active building permit for the work on May 19, 2026, after a May 8 permit for demolition of an existing 696-square-foot pool.

Summarized from City of Austin records · updated May 27, 2026

Projects
5
5 filings
Latest filing
May 27, 2026
since May 18, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express: foundation repair - installation of 8 perimeter piers for pool house slab repair. revision - we are needing to add a revision so our plumber is able to take out a permit for his scope of work. here is what he was advised by the coa permit chat to do since there is an active bp for the foundation repairs the gc will need to contact the residential intake team to obtain more information on how to add the plumbing permit to the active bp. the plumbers scope is the repair of a gas line

  1. AppliedMar 30, 2026
  2. IssuedMay 27, 2026
  3. WorkMay '26 – Jun '26
  4. Final inspectionJun 9, 2026

Passed final inspection Jun 9, 2026.

1 contact on this project · 1 phone number

Permit & project history

5 projects
  1. Express: foundation repair - installation of 8 perimeter piers for pool house slab repair. revision - we are needing to add a revision so our plumber is able to take out a permit for his scope of work. here is what he was advised by the coa permit chat to do since there is an active bp for the foundation repairs the gc will need to contact the residential intake team to obtain more information on how to add the plumbing permit to the active bp. the plumbers scope is the repair of a gas line

    Express: foundation repair - installation of 8 perimeter piers for pool house slab repair. revision - we are needing to add a revision so our plumber is able to take out a permit for his scope of work. here is what he was advised by the coa permit chat to do since there is an active bp for the foundation repairs the gc will need to contact the residential intake team to obtain more information on how to add the plumbing permit to the active bp. the plumbers scope is the repair of a gas line

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. New pool (189 sq ft) spa 33sqft) concrete decking retaining wall planter wall flatwork

    New pool (189 sq ft) spa 33sqft) concrete decking retaining wall planter wall flatwork

    City of Austin permitBuilding PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Total demolition of 696 sq ft pool circa 2017

    Total demolition of 696 sq ft pool circa 2017

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  4. Express: foundation repair - installation of 8 perimeter piers for pool house slab repair

    Express: foundation repair - installation of 8 perimeter piers for pool house slab repair

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  5. Install a 240v 60 amp circuit and install a level 2 car charger inside the garage

    Install a 240v 60 amp circuit and install a level 2 car charger inside the garage

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2009 Barton Pkwy

What is being built at 2009 Barton Pkwy?

A City of Austin permit describes a new 189-square-foot pool and 33-square-foot spa, along with concrete decking, a retaining wall, a planter wall and flatwork. The permit, 2026-061655 BP, was issued May 19, 2026, and is listed as active.

Is a new pool planned at 2009 Barton Pkwy?

Yes. Permit 2026-061655 BP, issued May 19, 2026, covers a new 189-square-foot pool and 33-square-foot spa.

What happened to the old pool at 2009 Barton Pkwy?

A City of Austin permit dated May 8, 2026, covers demolition of a 696-square-foot pool. The permit, 2026-050173 BP, is listed as final.

When was the pool project at 2009 Barton Pkwy permitted?

The new pool and spa permit was issued May 19, 2026. A separate permit for demolition of the existing pool was filed May 8, 2026.

Are there other recent permits at 2009 Barton Pkwy?

Yes. A March 31, 2026, permit covers foundation repairs to the pool house slab using eight perimeter piers. A May 27 plumbing permit records a gas-line repair and is listed as final.

Was an electric car charger permitted at 2009 Barton Pkwy?

A May 18, 2025, electrical permit covers installation of a 240-volt, 60-amp circuit and a Level 2 car charger inside the garage. The permit is listed as final.