2010 Goodrich Ave
Austin, TX 78704
Level 2 EV charger permitted at 2010 Goodrich Ave
A Level 2 EV charger is covered by an Austin electrical permit filed April 17, 2026. The permit describes a 48-amp charger connection; a separate site-plan case for “2010 Goodrich Phase 2” was approved and released in 2016.
Summarized from City of Austin records · updated Apr 17, 2026
- Projects
- 6
- 6 filings
- Latest filing
- Apr 17, 2026
- since Mar 29, 2013
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledLevel 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw
- AppliedApr 9, 2026
- IssuedApr 17, 2026
- WorkApr '26 – May '26
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
6 projectsLevel 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw
Level 2 ev charger powered by a 60amp circuit breaker. run #6 thhn c.u. & #10 thhn c.u. ground through <5 feet new 3/4 emt conduit to power the level 2 ev charger at 48amp constant draw
City of Austin permitElectrical PermitFinal- Record
- 2026-043363 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Excavate and repair leak in water line in the yard
Excavate and repair leak in water line in the yard
City of Austin permitPlumbing PermitFinal- Record
- 2024-015166 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-125566 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2010 Goodrich Ave
What is being built at 2010 Goodrich Ave?
The latest City of Austin record is for installing a Level 2 EV charger. Electrical permit 2026-043363 EP was filed April 17, 2026.
When was the EV charger permitted at 2010 Goodrich Ave?
The electrical permit is dated April 17, 2026, and has Final status. Its permit number is 2026-043363 EP.
What kind of EV charger is planned at 2010 Goodrich Ave?
The permit describes a Level 2 EV charger supplied by a 60-amp circuit breaker, with a 48-amp constant draw.
What is the 2010 Goodrich Phase 2 project?
Austin case 11491780 is a site-plan case named “2010 Goodrich Phase 2.” It was approved and released on October 3, 2016.
Are there subdivision records for 2010 Goodrich Ave?
Yes. Two City of Austin subdivision cases concern resubdivision of Lots 1 and 2 in the Mrs. Omer A. Copeland Subdivision. Both are recorded, with case dates of March 29 and June 25, 2013.
Also being built nearby
All of 78704- 2012 Goodrich AveOct 22, 2026Eplan: residential expedited review - new two unit res. building 2 new construction of a 2-story single-family residence [4bed 4.5bath] with attached garage · 47 m away
- 2015 Goodrich AveMay 4, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 3 ton ac system and includes ductwork · 60 m away
- 1901 Hether StSep 16, 2026New in-ground swimming pool- existing 180sqft pool replacement after total demolition. pool to be replaced like for like · 77 m away
- 1903 Hether StNov 5, 2026New irrigation installation · 89 m away
- 2016 Goodrich AveMar 2, 2007Goodrich estates — goodrich estates · 93 m away
- 2006 Goodrich AveNov 17, 2015Bruno addition(withdrawel/resubmittal of c8-2013-0210.0a) · 97 m away
- 1806 Hether StMar 12, 2024Addition add 737 sq ft to existing dwelling and 375 sq ft of covered porch interior renovation to reorganize interior spaces in existing dwelling · 97 m away
- 2005 Bluebonnet LnSep 28, 2026Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 1711 Valeria StMay 2, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - like for like. replace current system with new 2 ton and 3 ton multi-stage trane system · 114 m away
- 1707 Hether StMar 18, 2024Upgrade main service panel · 118 m away
- 1714 Valeria StJul 7, 2026Eplan: residential expedited review: unit b: addition of new second floor dwelling unit on existing 2-story single family residence accessed via spiral staircase. single-family to duplex. work to include new fire-rating in wall & floor-ceiling assembly. 1 bedroom 2 bathroom · 120 m away
- 1705 Hether StApr 11, 2025Repair broken pipe in yard sewer line · 132 m away