2013 De Verne St
Austin, TX 78704
2013 De Verne St: 1 project on record
City of Austin lists 1 filing across 1 project at 2013 De Verne St, Austin, TX 78704. The most recent, filed April 1, 2024, covers: “Replace approximately 70 of sewer line from back of house to sewer tap”.
Compiled from City of Austin records · updated Apr 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 1, 2024
- since Apr 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace approximately 70 of sewer line from back of house to sewer tap
- AppliedMar 26, 2024
- IssuedApr 1, 2024
- WorkApr '24 – Apr '24
- Final inspectionApr 11, 2024
Passed final inspection Apr 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace approximately 70 of sewer line from back of house to sewer tap
Replace approximately 70 of sewer line from back of house to sewer tap
City of Austin permitPlumbing PermitFinal- Record
- 2024-037689 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2013 De Verne St
What is being built at 2013 De Verne St?
The latest filing (City of Austin permit 2024-037689 PP, April 1, 2024) covers replace approximately 70 of sewer line from back of house to sewer tap.
How many permits and filings does 2013 De Verne St have?
1 filing across 1 project, from April 1, 2024 to April 1, 2024.
Is there other construction near 2013 De Verne St?
Yes. Nearby filings include 2014 Arpdale St (irrigation installation, Aug 13, 2024); 2008 De Verne St (eplan: residential expedited review - new construction of a 2-story single family res. [4bed 4.5bath] with habitable attic attached carport, Apr 8, 2026); 2008 Arpdale St (replacement of complete existing central heat and air system with or without duct work install a lennox 1.5 ton horizontal gas el18 supply in place of the old unit, Oct 1, 2025).
How do I get alerts for new permits at 2013 De Verne St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2014 Arpdale StAug 13, 2024Irrigation installation · 36 m away
- 2008 De Verne StApr 8, 2026Eplan: residential expedited review - new construction of a 2-story single family res. [4bed 4.5bath] with habitable attic attached carport · 57 m away
- 2008 Arpdale StOct 1, 2025Replacement of complete existing central heat and air system with or without duct work install a lennox 1.5 ton horizontal gas el18 supply in place of the old unit · 64 m away
- 2011 Arpdale StNov 28, 2023Install 22kw home standby generator · 80 m away
- 2015 Arpdale StApr 11, 2024Stand alone generator. install underground gas line · 84 m away
- 2009 Arpdale StMay 26, 2026Replacement of complete existing central heat and air system with or without duct work **lorraine atherton: replacing like for like 2.5t gas; no structural change · 88 m away
- 2007 Arpdale StJan 20, 2026Unit b addition to main house to create a duplex · 99 m away
- 2103 Rabb Glen StMay 1, 2026Replacement of an existing water heater replacement of gas water heater like for like · 101 m away
- 2109 Rabb Glen StApr 26, 2024Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 2405 Ann Arbor AveMay 8, 2026Garage conversion on unit b: convert existing garage to study living room 1 bedroom 1 bath with storage · 108 m away
- 2409 Ann Arbor AveJul 17, 2025Installation of 11.18kw solar pv system · 109 m away
- 2102 Rabb Glen StJul 22, 2024(oswald julia) - installation of circuit for elec. vehicle charging station - esip · 112 m away