205 Lightsey Rd
Austin, TX 78704
Interior remodel permitted at 205 Lightsey Road
City of Austin records show an interior remodel of a single-family residence at 205 Lightsey Road. A building permit was filed July 14, 2025, followed by an electrical permit on December 4, 2025; both are marked final.
Summarized from City of Austin records · updated Dec 4, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Dec 4, 2025
- since Feb 5, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInterior remodel of sfr
- AppliedMar 15, 2025
- IssuedDec 4, 2025
- WorkDec '25 – Jun '26
- Final inspectionJun 11, 2026
Passed final inspection Jun 11, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsInterior remodel of sfr
Interior remodel of sfr
City of Austin permitElectrical PermitFinal- Record
- 2025-062717 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel of sfr
Interior remodel of sfr
City of Austin permitBuilding PermitFinal- Record
- 2025-062717 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
135 tunnel below the foundation to replace entire cast-iron drain system and 12 trench for partial sewer replacement. 4 access holes - 1 front back left right and repair water line in trench due to excavator
135 tunnel below the foundation to replace entire cast-iron drain system and 12 trench for partial sewer replacement. 4 access holes - 1 front back left right and repair water line in trench due to excavator
City of Austin permitPlumbing PermitFinal- Record
- 2025-005311 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install new dual meter 200 amp service for duplex
Install new dual meter 200 amp service for duplex
City of Austin permitElectrical PermitFinal- Record
- 2023-115562 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 205 Lightsey Rd
What is being built at 205 Lightsey Road?
City permits indicate an interior remodel of a single-family residence, not a new building. The building permit is 2025-062717 BP.
When was the remodel at 205 Lightsey Road permitted?
The building permit was filed July 14, 2025. An electrical permit for the same interior remodel was filed December 4, 2025.
Is a new home going up at 205 Lightsey Road?
The records provided do not indicate new construction. They list permits for an interior remodel of a single-family residence.
What plumbing work was permitted at 205 Lightsey Road?
A plumbing permit filed February 5, 2025, covers work to replace the cast-iron drain system, partially replace the sewer, and repair a water line. The permit number is 2025-005311 PP.
What does permit 2025-062717 EP cover?
The City of Austin electrical permit describes electrical work for an interior remodel of a single-family residence. It was filed December 4, 2025, and is marked final.
Also being built nearby
All of 78704- 3501 Alpine CirApr 21, 2026New service gutter will be installed and supplied by twin 350 kcmil conductors with dual weatherheads. from the gutter each service will drop to a new lever-bypass meter base and feed a 200-amp rated panel (protected at 150 amps). all grounding bonding clearances labeling and installation methods will comply with current nec and local authority requirements and utility coordination will be performed as required. old clock service conductor currently with 400 amp service drop each one. total service will be 800amps · 40 m away
- 303 Lightsey RdJan 30, 2026Total demolition of sfr 1213 sq ft circa 1964 · 45 m away
- 401 South Park DrSep 2, 2026Enclave at south park · 62 m away
- 206 Lightsey RdSep 30, 2024Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 118 Lightsey RdFeb 24, 2024Install an irrigation system to permit address · 81 m away
- 403 South Park DrSep 14, 2026Enclave at south park · 82 m away
- 305 Lightsey RdFeb 13, 2024Cap off and eliminate and remove sections of gas piping in the attic · 87 m away
- 3507 Alpine CirOct 19, 2026Express - replace windows for same size replace exterior doors same size fix force fix electric wall panels and re-paint we do not plan any of the building structure we are keeping as is · 97 m away
- 300 Lightsey RdJul 25, 2025New 2 story secondary dwelling rear of main house 2/1.5 · 98 m away
- 125 Frederick StMay 20, 202662 feet of subfloor tunnel and a complete cast iron re-pipe. sewer yard line replacement. the residence has two bathrooms kitchen sink and a washer box. no gas work or domestic water work will be performed. all fixtures will remain in their current configuration. the sewer yard line will be replaced all the way to the city tap. the city tap is updated and we will tie in just before it · 104 m away
- 114 Lightsey RdSep 25, 2025Irrigation installation · 106 m away
- 300 Ashley Dawn LnJul 25, 2024Replacement of complete existing central heat and air system with or without duct work · 115 m away