2202 Farnswood Cir
Austin, TX 78704
2202 Farnswood Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 2202 Farnswood Cir, Austin, TX 78704. The most recent, filed September 22, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work replace upflow unit”.
Compiled from City of Austin records · updated Sep 22, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 22, 2025
- since Sep 22, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work replace upflow unit
- AppliedJul 2, 2025
- IssuedSep 22, 2025
- WorkSep '25 – Nov '25
- Final inspectionNov 20, 2025
Passed final inspection Nov 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work replace upflow unit
Replacement of complete existing central heat and air system with or without duct work replace upflow unit
City of Austin permitMechanical PermitFinal- Record
- 2025-082200 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2202 Farnswood Cir
What is being built at 2202 Farnswood Cir?
The latest filing (City of Austin permit 2025-082200 MP, September 22, 2025) covers replacement of complete existing central heat and air system with or without duct work replace upflow unit.
How many permits and filings does 2202 Farnswood Cir have?
1 filing across 1 project, from September 22, 2025 to September 22, 2025.
Is there other construction near 2202 Farnswood Cir?
Yes. Nearby filings include 2104 Farnswood Cir (tunneling under foundation to repair drain lines to kitchen, Sep 24, 2024); 2205 Farnswood Cir (addition to existing 1-story single-family residential to include: 1 bedroom 1 bath; front porch enclosed to become office and foyer; new covered front porch. interior remodel of kitchen and dining room, May 29, 2025); 2303 Barton Hills Dr (replacement of a 40 g ng water heater in garage, May 28, 2024).
How do I get alerts for new permits at 2202 Farnswood Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2104 Farnswood CirSep 24, 2024Tunneling under foundation to repair drain lines to kitchen · 47 m away
- 2205 Farnswood CirMay 29, 2025Addition to existing 1-story single-family residential to include: 1 bedroom 1 bath; front porch enclosed to become office and foyer; new covered front porch. interior remodel of kitchen and dining room · 62 m away
- 2303 Barton Hills DrMay 28, 2024Replacement of a 40 g ng water heater in garage · 72 m away
- 2301 Barton Hills DrMar 13, 2026Replacement of an existing water heater replace existing 40-gallon gas water heater with new 40-gallon gas unit; no structural change · 77 m away
- 2307 Barton Hills DrNov 20, 2023Express window replacement (size for size replacement) · 85 m away
- 2102 Four Oaks LnDec 25, 2024Install irrigation system · 105 m away
- 2155 Barton Hills DrMar 12, 2024Install gas piping for generator · 109 m away
- 2317 Farnswood CirFeb 2, 2026Install new tankless hot water heater · 117 m away
- 2100 Four Oaks LnJul 23, 202570 tunnel tunnel below the foundation to replace entire cast-iron drain system and 20 trench through driveway to remove remaining cast iron yard sewer line. 3 access holes - front back right · 126 m away
- 2304 Barton Hills DrMay 24, 2026Replacement of complete existing central heat and air system with or without duct work james ramsey: replacement of 5t like-for-like gas system · 126 m away
- 2300 Barton Hills DrAug 5, 2026Eplan: residential expedited review - addition and remodel to existing 1-story single family res. work to include: first floor addition 2nd floor addition interior remodel [6bed 4.5bath] and pool repair · 127 m away
- 2206 Barton Hills DrJun 10, 2025Install level 2 ev charger · 131 m away