2212 Trailside Dr
Austin, TX 78704
2212 Trailside Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 2212 Trailside Dr, Austin, TX 78704. The most recent, filed February 26, 2024, covers: “Irrigation install”.
Compiled from City of Austin records · updated Feb 26, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Feb 26, 2024
- since Feb 26, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledIrrigation install
- AppliedNov 16, 2021
- IssuedFeb 26, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 15, 2024
Passed final inspection Mar 15, 2024.
Permit & project history
2 projectsIrrigation install
Irrigation install
City of Austin permitPlumbing PermitFinal- Record
- 2024-022967 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
***per coordination with 23-146414 ex this project cleared the row on 11/17/23. no work to occur after this date without additional coordination*** construct new driveway approach of 12 ft and curb & gutter of 50 ft. fee in lieu of sidewalk paid. *rs
***per coordination with 23-146414 ex this project cleared the row on 11/17/23. no work to occur after this date without additional coordination*** construct new driveway approach of 12 ft and curb & gutter of 50 ft. fee in lieu of sidewalk paid. *rs
City of Austin permitDriveway / SidewalksFinal- Record
- 2022-100872 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2212 Trailside Dr
What is being built at 2212 Trailside Dr?
The latest filing (City of Austin permit 2024-022967 PP, February 26, 2024) covers irrigation install.
How many permits and filings does 2212 Trailside Dr have?
2 filings across 2 projects, from February 26, 2024 to February 26, 2024.
Is there other construction near 2212 Trailside Dr?
Yes. Nearby filings include 2301 Trailside Dr (install rp for pool fill, Jun 9, 2026); 2303 Trailside Dr (cap off for water and wastewater total demolition of duplex 2002 sq ft circa 1972 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage, Aug 21, 2024); 2204 Spring Creek Dr (installing temporary power pole for construction use, Oct 27, 2026).
How do I get alerts for new permits at 2212 Trailside Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2301 Trailside DrJun 9, 2026Install rp for pool fill · 39 m away
- 2303 Trailside DrAug 21, 2024Cap off for water and wastewater total demolition of duplex 2002 sq ft circa 1972 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 56 m away
- 2204 Spring Creek DrOct 27, 2026Installing temporary power pole for construction use · 71 m away
- 2208 Spring Creek DrJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 75 m away
- 2400 Trailside DrMar 18, 2024Excavate 35 tunnel to repair drain line · 91 m away
- 1208 Hollow Creek DrOct 28, 2025Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 2401 Trailside DrJun 17, 2024Installation of roof mounted solar panels · 119 m away
- 2202 Trailside DrOct 13, 2025*partial demolition* interior remodel converting existing basement to office and converting carport to garage. adding roof top deck. changing few windows and doors · 121 m away
- 2304 Spring Creek DrSep 29, 2026Generac system removal and reinstall for siding. surge protection installed. no meter work. ae is the electrical provider · 123 m away
- 2404 Trailside DrJan 10, 2024Replacement of an existing water heater · 124 m away
- 2201 Trailside DrApr 25, 2025Replacement of complete existing central heat and air system with or without duct work like for like change out for a goodman 2.5 ton 14.3 seer2 heat pump upflow **4/25/25- unit a · 128 m away
- 2303 Spring Creek DrOct 20, 202595 tunnel below the foundation to replace entire drain system. 4 access holes - front left back back · 127 m away