2323 Lamar Blvd
Austin, TX 78704
Mixed-use project planned at 2323 South Lamar
A mixed-use project is planned at 2323 Lamar Blvd in Austin. A City of Austin site-plan case filed on November 20, 2025, was approved and released.
Summarized from City of Austin records · updated Nov 20, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2025
- since Nov 20, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2323 Lamar Blvd
What is being built at 2323 Lamar Blvd?
A City of Austin case identifies a mixed-use project at the address. Its site plan was approved and released.
When was the site plan for 2323 South Lamar approved?
The City of Austin case was filed on November 20, 2025, and its status is Approved and Released.
Is 2323 Lamar Blvd a mixed-use project?
Yes. The City of Austin case is named “2323 South Lamar Mixed Use” and lists the project type as a site plan.
What's planned near Roselle Pizzeria on South Lamar?
A mixed-use project is planned at 2323 Lamar Blvd, about 158 meters from Roselle Pizzeria, according to the nearby-landmark record.
How large is the 2323 South Lamar mixed-use project?
The available City of Austin case does not list a project size or square footage.
Also being built nearby
All of 78704- 2330 S Lamar BlvdMay 15, 2026Certifid — renovation/alteration — dividing single tenant floor into two suites. minor renovations to each suite · 84 m away
- 2401 S Lamar BlvdJul 10, 2026Update existing plugs and change lights to led · 85 m away
- 2401 Lamar BlvdApr 28, 2023Walgreens at bluebonnet and lamar · 85 m away
- 2330 Lamar Blvd · Mirabeau Office PartnersJun 19, 2025Be fit modern pilates — renovation/alteration — remodel · 86 m away
- 2505 Bluebonnet LnSep 14, 2026Garage conversion-add a study in the garage increasing the square footage on the first floor from 50 to 210 sq ft · 91 m away
- 2208 Del Curto RdJul 10, 2024The delta tunnel work 2 buildings will have all sewer plumbing under their foundations replaced. up to 160 of tunneling · 94 m away
- 2414 S Lamar BlvdAug 12, 2025Interior remodel for new restaurant. demolition a non-structural wall and build a new wall to increase the size of the kitchen. replace existing 100-gallon grease trap with larger one · 99 m away
- 2323 South Lamar Boulevard 2323 South Lamar Boulevard · 2323 South Lamar LLCSep 30, 2026Isi - austin — renovation/alteration — gym tenant improvement · 103 m away
- 2323 S Lamar Blvd · 2323 South Lamar Owner LLCNov 9, 2026First generation tenant improvement. proposed gym use · 103 m away
- 2323 South Lamar Boulevard · 2323 South Lamar Owner, LLCJul 10, 20252323 south lamar mixed use — new construction — total building area: 310611 sq ft the project consists of below grade parking, 179 r-1 transient units, 26 r-2 apartment units, amenities, and retail · 103 m away
- 2416 S Lamar BlvdOct 11, 2024Change of use from admin/office to medical office (counseling) and remove 5 interior (non-bearing) walls; gut restrooms and make ada compliant replace damage ceiling tiles replaced damaged sheetrock repair and re-lamp light fixtures for suite a · 108 m away
- 2301 Lamar BlvdJun 2, 2015Bluebonnet studios · 113 m away