2400 Congress Ave
Austin, TX 78704
Site plan approved for H-E-B Austin #8 on Congress Avenue
A site plan for H-E-B Austin #8 at 2400 Congress Ave was approved and released on December 3, 2024. The record does not specify the scope of work, square footage or project cost.
Summarized from City of Austin records · updated Dec 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 3, 2024
- since Dec 3, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 2400 Congress Ave
What is being built at 2400 Congress Ave in Austin?
An Austin site plan for H-E-B Austin #8 was approved and released on December 3, 2024. The record does not describe specific construction or other work.
What is the status of the H-E-B Austin #8 project?
The City of Austin case is marked “Approved and Released.” The case number is 12203806.
When was the site plan for 2400 Congress Ave filed?
The City of Austin record is dated December 3, 2024, and lists that date as both the first and latest filing.
How large is the project at 2400 Congress Ave?
The record does not list a project area or square footage.
How much will the H-E-B Austin #8 project cost?
No project cost is listed in the City of Austin record.
What is planned near Austin 08 Fresh Initiative?
A site plan for H-E-B Austin #8 at 2400 Congress Ave was approved and released on December 3, 2024. The nearby landmark listing places Austin 08 Fresh Initiative about 90 meters away.
Also being built nearby
All of 78704- 2400 S Congress AveNov 16, 2026Project consists of upgrades to the refrigerated display cases gondola shelving and end caps relocations at various departments within the store with some mep modifications
- 101 Oltorf StMar 2, 2007Heb austin no. 8 partner parking · 64 m away
- 121-1/2 Oltorf StJul 30, 2024H-e-b oltorf street improvement · 65 m away
- 2400 South Congress Avenue · H-E-B Grocery Company, LPSep 30, 2025Heb austin 8 — renovation/alteration — addition of a new loading ramp for convenience of store personnel in moving product carts through space. ramp is not intended for accessible egress or public use · 90 m away
- 2400 South Congress Ave · Heb LPJun 5, 2026Austin 08 fresh initiative — renovation/alteration — minor interior remodel · 90 m away
- 120 Oltorf StMar 2, 2007St ignatus school gym · 91 m away
- 127-1/2 Oltorf StJan 10, 2025Heb oltorf utility relocation · 108 m away
- 2424 Congress AveJun 29, 2009Heb/congress & oltorf — heb/congress & oltorf · 118 m away
- 2401 S Congress AveMar 19, 2026Addition of a manual transfer switch to the building after the main service disconnect to provide capabilities to connect a temporary towable generator when needed during outages. the manual transfer switch is equipped with an interlock mechanism that prevent utility and/or generator power to back feed each other · 123 m away
- 2407 S Congress AveSep 14, 2026#130-160929 · 123 m away
- 2501 S Congress AveDec 13, 2024Replacement of complete existing central heat and air system with or without duct work bank of america- replace one trane hvac system with hot water coils · 162 m away
- 2510 Congress AveMay 31, 20242510 s congress · 164 m away