groundranger
Recent · latest filing Jan 2026Residential

2400 Kinney Rd

Austin, TX 78704

Home HVAC replacement and EV charger circuit at 2400 Kinney Rd

Permits indicate a replacement of the home's existing central heat and air system and installation of a circuit for an electric car charger. The mechanical permit was filed September 11, 2025, and the electrical permit was filed January 1, 2026; both are marked final.

Summarized from City of Austin records · updated Jan 1, 2026

Projects
2
2 filings
Latest filing
Jan 1, 2026
since Sep 11, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install 220v 50a circuit for electric car charger within 5 ft of panel

  1. AppliedNov 19, 2025
  2. IssuedJan 1, 2026
  3. WorkJan '26 – Feb '26
  4. Final inspectionJul 13, 2026

Passed final inspection Jul 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install 220v 50a circuit for electric car charger within 5 ft of panel

    Install 220v 50a circuit for electric car charger within 5 ft of panel

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work hvac change out: 2 ton horizontal gas system

    Replacement of complete existing central heat and air system with or without duct work hvac change out: 2 ton horizontal gas system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2400 Kinney Rd

What is being built at 2400 Kinney Rd?

The permits indicate home improvements, not a new building: replacement of the existing central HVAC system and installation of a circuit for an electric car charger.

Is a new home being built at 2400 Kinney Rd?

The records list an HVAC system replacement and an electrical circuit for an EV charger. They do not list a new home construction permit.

What HVAC work was permitted at 2400 Kinney Rd?

A mechanical permit filed September 11, 2025, covers replacement of the existing central heat and air system with a 2-ton horizontal gas system. Permit 2025-101037 MP is marked final.

Is an electric car charger being installed at 2400 Kinney Rd?

An electrical permit covers a 220-volt, 50-amp circuit for an electric car charger within 5 feet of the panel. Permit 2025-148704 EP, filed January 1, 2026, is marked final.

When were permits filed for work at 2400 Kinney Rd?

The mechanical permit was filed September 11, 2025, and the electrical permit was filed January 1, 2026. Both records are marked final.

Also being built nearby

All of 78704
Email me when a new permit is filed