2413 Thornton Rd
Austin, TX 78704
Thornton 2 site plan approved at 2413 Thornton Rd
City of Austin records show a site plan case named Thornton 2 was approved and released on January 21, 2022. The records do not specify the project’s use or size. A later case named Thornton Assemblage was filed on February 14, 2024, and is listed as expired.
Summarized from City of Austin records · updated Feb 14, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Feb 14, 2024
- since Nov 7, 2008
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsSources: City of Austin
Questions about 2413 Thornton Rd
What is being built at 2413 Thornton Rd?
Austin records show a site plan case named Thornton 2, approved and released in 2022. The records do not specify what the project would include.
Is the Thornton 2 project at 2413 Thornton Rd approved?
The City of Austin lists case 11758384, filed January 21, 2022, as Approved and Released.
What is the status of the Thornton Assemblage plan?
The City of Austin lists Thornton Assemblage case 13127088, filed February 14, 2024, as Expired.
When was the latest development case filed for 2413 Thornton Rd?
The latest listed case was filed February 14, 2024. It was named Thornton Assemblage and is marked Expired.
How large is the planned project at 2413 Thornton Rd?
The available Austin records do not provide a project square footage.
Also being built nearby
All of 78704- 2401 Thornton RdMar 2, 2007Marart warehouses and offices · 92 m away
- 2505 Thornton RdJan 27, 2015Thornton trails (resubmittal of c8-2012-0109.0a) · 94 m away
- 2501 Thornton RdMay 18, 2026Bathroom remodel for an apartment unit · 108 m away
- 2409 Thornton RdMar 2, 2007Sprint ion pop · 108 m away
- 2315 Thornton RdNov 5, 2012Lot 20, blk 1, fredricksburg rd acres subdivision;resubd of 1.1729 acres · 137 m away
- 2509 Thornton RdSep 24, 2026Replacement of an existing water heater water heater change out 2509 thornton road austin tx 78704 · 149 m away
- 2513 Thornton RdMay 19, 2026Install level 2 ev charger · 159 m away
- 1400 Bridgeway DrSep 25, 2026100amp outdoor main breaker panel replacement. no meter work. ae is the electrical provider · 167 m away
- 2506 Thornton RdJul 10, 2024Replacement of complete existing central heat and air system with or without duct work · 170 m away
- 1502 Bridgeway DrMar 13, 2024Replacement of an existing water heater · 176 m away
- 2309 Thornton RdJun 5, 2025Fabricate and install sign number two for the same address on west elevation · 180 m away
- 2510 Thornton RdMay 15, 2025Express: master bathroom remodel with new plumbing **replace window new standalone tub new walk-in shower new vanity new plumbing & electrical · 181 m away