2504 Southland Dr
Austin, TX 78704
2504 Southland Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2504 Southland Dr, Austin, TX 78704. The most recent, filed June 14, 2024, covers: “Exterior upgrade and reconnect electrical service”.
Compiled from City of Austin records · updated Jun 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 14, 2024
- since Jun 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExterior upgrade and reconnect electrical service
- AppliedJun 12, 2024
- IssuedJun 14, 2024
- WorkJun '24 – Jun '24
- Final inspectionJun 25, 2024
Passed final inspection Jun 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectExterior upgrade and reconnect electrical service
Exterior upgrade and reconnect electrical service
City of Austin permitElectrical PermitFinal- Record
- 2024-074073 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2504 Southland Dr
What is being built at 2504 Southland Dr?
The latest filing (City of Austin permit 2024-074073 EP, June 14, 2024) covers exterior upgrade and reconnect electrical service.
How many permits and filings does 2504 Southland Dr have?
1 filing across 1 project, from June 14, 2024 to June 14, 2024.
Is there other construction near 2504 Southland Dr?
Yes. Nearby filings include 2506 Southland Dr (new inground pool and spa, Dec 12, 2023); 2509 Southland Dr (150amp service upgrade, Mar 14, 2025); 2503 Del Curto Rd (replacement of complete existing central heat and air system with or without duct work, Jul 8, 2026).
How do I get alerts for new permits at 2504 Southland Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2506 Southland DrDec 12, 2023New inground pool and spa · 14 m away
- 2509 Southland DrMar 14, 2025150amp service upgrade · 51 m away
- 2503 Del Curto RdJul 8, 2026Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 2501 Southland DrOct 2, 2026Upgrade service to 200a · 58 m away
- 2405 Del Curto RdApr 25, 2025New construction in-ground pool · 77 m away
- 2407 Southland DrMay 20, 2026Replacement of complete existing central heat and air system with or without duct work 2 complete system one 3 and other 2.5 tons · 80 m away
- 2511 Del Curto RdOct 8, 2025Express - replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space · 83 m away
- 2403 Del Curto RdApr 22, 2026Replacement of an existing water heater · 88 m away
- 2500 Kinney RdApr 15, 2024Install power for car charger · 91 m away
- 2504 Kinney RdMar 18, 2024(walters tesla matthew) installation of ev charger bi-directional capable - esip · 93 m away
- 2502 Kinney RdMar 3, 2025Replacement of an existing water heater 40gl ng wh · 96 m away
- 2405 Southland DrJun 24, 2026Construct new uncovered wood deck system attached to existing residence with ledger board connection including deck 1 deck 2 deck 3 connecting deck walk structural framing piers/footings and associated site work around existing pool. existing residence adu and pool to remain · 98 m away