2608 Sherwood Ln
Austin, TX 78704
2608 Sherwood Ln: 4 projects on record
City of Austin lists 4 filings across 4 projects at 2608 Sherwood Ln, Austin, TX 78704. The most recent, filed November 15, 2026, covers: “Replace sewer line from back yard to the clean out located on the left side of the home and down to the city tap connection. length of sewer line is a total of 70 feet and repipe and give proper fall to the sewer line”.
Compiled from City of Austin records · updated Nov 15, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Nov 15, 2026
- since Nov 15, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace sewer line from back yard to the clean out located on the left side of the home and down to the city tap connection. length of sewer line is a total of 70 feet and repipe and give proper fall to the sewer line
- AppliedNov 1, 2026
- IssuedNov 15, 2026
- WorkNov '26 – Nov '26
- Final inspectionNov 19, 2026
Passed final inspection Nov 19, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplace sewer line from back yard to the clean out located on the left side of the home and down to the city tap connection. length of sewer line is a total of 70 feet and repipe and give proper fall to the sewer line
Replace sewer line from back yard to the clean out located on the left side of the home and down to the city tap connection. length of sewer line is a total of 70 feet and repipe and give proper fall to the sewer line
City of Austin permitPlumbing PermitFinal- Record
- 2026-144062 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace tankless water heater
Replace tankless water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-147729 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitPending- Record
- 2024-043516 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Installation of ev charger
Installation of ev charger
City of Austin permitElectrical PermitFinal- Record
- 2023-005349 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2608 Sherwood Ln
What is being built at 2608 Sherwood Ln?
The latest filing (City of Austin permit 2026-144062 PP, November 15, 2026) covers replace sewer line from back yard to the clean out located on the left side of the home and down to the city tap connection. length of sewer line is a total of 70 feet and repipe and give proper fall to the sewer line.
How many permits and filings does 2608 Sherwood Ln have?
4 filings across 4 projects, from November 15, 2026 to November 15, 2026.
Is there other construction near 2608 Sherwood Ln?
Yes. Nearby filings include 2610 Sherwood Ln (adding a solar pv rooftop system to an existing residence, Jul 9, 2024); 2607 Sherwood Ln (express - install 4 push piers, Oct 12, 2026); 2609 Carnarvon Ln (eplan: residential expedited review - new two story duplex unit b 1-story [1bath] with attached garage, Apr 6, 2026).
How do I get alerts for new permits at 2608 Sherwood Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2610 Sherwood LnJul 9, 2024Adding a solar pv rooftop system to an existing residence · 19 m away
- 2607 Sherwood LnOct 12, 2026Express - install 4 push piers · 42 m away
- 2609 Carnarvon LnApr 6, 2026Eplan: residential expedited review - new two story duplex unit b 1-story [1bath] with attached garage · 43 m away
- 2611 Sherwood LnAug 28, 2025New pool for single family residence (with plumbing permit) · 48 m away
- 2605 Carnarvon LnMar 12, 2026Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 2616 Sherwood LnOct 20, 2026Pre-wire only for future residential rooftop solar. we are currently only contracted to complete the pre-wire · 80 m away
- 601 Long Bow LnOct 10, 2025Construct new driveway approach of 16 ft · 81 m away
- 2608 Carnarvon LnMar 20, 2025Upgrade electrical service (300a) main distribution panel (150a) and revenue meter for unit 1 and unit 2 · 85 m away
- 2617 Carnarvon LnAug 6, 2025Per gas company remove 5 ft section of copper pipe in attic for furnace and change to ridged black pipe · 91 m away
- 2606 Friar Tuck LnOct 21, 2026Replace sanitary sewer yard line · 99 m away
- 2616 Carnarvon LnNov 30, 2023Install 40gal ng wh with new stand pan and drain line · 120 m away
- 2703 Sherwood LnNov 14, 20241-story primary suite addition with interior remodel. adding 2 bed/1 bath (total 5 bed/3 bath) uncovered wood deck amnesty certificate of occupancy for unpermitted existing 1-story addition with covered patio · 127 m away