groundranger
Active · latest filing Sep 2026Residential

2628 Deerfoot Trl

Austin, TX 78704

Permit for hardwired EV charger at 2628 Deerfoot Trl

An Austin electrical permit filed September 17, 2026, covers installation of a hardwired EV charger at 2628 Deerfoot Trl. The scope includes a 60-amp circuit from the main panel to the garage, run in EMT; the permit is marked final.

Summarized from City of Austin records · updated Sep 17, 2026

Projects
1
1 filings
Latest filing
Sep 17, 2026
since Sep 17, 2026
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install hardwired evc charger. 60 amp circuit from main panel to garage. emt

  1. AppliedSep 14, 2026
  2. IssuedSep 17, 2026
  3. WorkSep '26 – Sep '26
  4. Final inspectionSep 29, 2026

Passed final inspection Sep 29, 2026.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Install hardwired evc charger. 60 amp circuit from main panel to garage. emt

    Install hardwired evc charger. 60 amp circuit from main panel to garage. emt

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2628 Deerfoot Trl

What is being installed at 2628 Deerfoot Trl?

An Austin electrical permit covers a hardwired EV charger and a 60-amp circuit from the main panel to the garage.

When was the EV charger permit filed?

The permit was filed on September 17, 2026. Its status is listed as final.

What does permit 2026-120609 EP cover?

The permit covers installation of a hardwired EV charger, with a 60-amp circuit running from the main panel to the garage in EMT.

Is the EV charger permit at 2628 Deerfoot Trl final?

Yes. City of Austin permit 2026-120609 EP is listed with final status.

Where will the EV charger circuit run?

The permit description says the 60-amp circuit will run from the main panel to the garage, using EMT.

Also being built nearby

All of 78704
Email me when a new permit is filed