2700 S 1st St
Austin, TX 78704
Sewer-line replacement permitted at 2700 S 1st St
A plumbing permit for sewer-line replacement at 2700 S 1st St was filed on December 23, 2024. The work description calls for tunneling 135 feet under the building to replace the main sewer line and connect it to existing drain pipes in the slab.
Summarized from City of Austin records · updated Dec 23, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 23, 2024
- since Dec 23, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunneling 135 feet under building to replace all main sewer line. tieing into existing drain pipes in slab
- AppliedDec 17, 2024
- IssuedDec 23, 2024
- WorkDec '24 – Jan '25
- Final inspectionJan 6, 2025
Passed final inspection Jan 6, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunneling 135 feet under building to replace all main sewer line. tieing into existing drain pipes in slab
Tunneling 135 feet under building to replace all main sewer line. tieing into existing drain pipes in slab
City of Austin permitPlumbing PermitFinal- Record
- 2024-164505 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2700 S 1st St
What work is happening at 2700 S 1st St in Austin?
A City of Austin plumbing permit describes tunneling 135 feet under the building to replace the main sewer line and connect it to existing drain pipes in the slab.
Was a new building permitted at 2700 S 1st St?
The available record is for sewer-line replacement, not a new building. It is permit 2024-164505 PP, filed December 23, 2024.
When was the sewer work at 2700 S 1st St permitted?
The City of Austin permit was filed on December 23, 2024. Its status is listed as Final.
What does permit 2024-164505 PP cover?
The plumbing permit covers tunneling 135 feet under the building to replace the main sewer line and tie into existing drain pipes in the slab.
How long is the sewer tunnel planned for 2700 S 1st St?
The permit description specifies 135 feet of tunneling under the building for the sewer-line replacement.
Also being built nearby
All of 78704- 2705 S 2nd StFeb 18, 2026Replacement of complete existing central heat and air system with or without duct work 2705 s 2nd st unit b · 47 m away
- 2701 S 2nd StOct 18, 2026Generator gas line · 47 m away
- 2702 S 2nd StMay 6, 2024Addition of 198 sq ft new porch in front of the house remove bedroom window and replace with new doors that open to porch · 59 m away
- 2707 S 1st StSep 29, 2025Remove and replace burnt wire from service gutter to 200amp panel · 72 m away
- 2612 S 1st StMar 25, 2024Cap off · 80 m away
- 2612 1st St · Drew FinebergNov 16, 2026South first and cumberland · 80 m away
- 2610 S 1st StFeb 6, 2024Cap off · 103 m away
- 2804 S 1st StAug 23, 2024I will be adding a 220 outlet on a 60 amp breaker with about 10-20 feet of wire/conduit run · 113 m away
- 2616 Stacy LnJun 5, 2025Sewer line sectional repair · 126 m away
- 705 Huerta StJul 5, 2024New inground swimming pool and spa with reqd enclosure device for existing duplex residence (unit a) · 137 m away
- 2810 S 1st StSep 22, 2026Repair existing 400a 120/240v 3-phase ct-metered electrical service. install retrofit door on existing ct enclosure and replace three existing cts per austin energy metering requirements. existing service size to remain unchanged. austin energy case #4609415119 · 140 m away
- 2714 Stacy LnApr 13, 2026Repair on: leak is coming from a broken 3 x 2 combo fitting about 3 feet down the master toilet line that serves as the vent for the toilet. the fitting is broken right on the 2 inch bell on that 3 x 2 combo fitting. a plumbing repair estimate will be provided along with estimated cost for centex to tunnel and expose the broken fitting for us to make a proper repair on it · 141 m away