2715 Tether Trl
Austin, TX 78704
Permits cover window, electrical panel and EV charger upgrades
Austin permits indicate replacement of 16 windows and electrical upgrades, including a Level 2 EV charger, at 2715 Tether Trl. The electrical permit was filed August 15, 2025, and the window permit was filed September 30, 2026; both are listed as active.
Summarized from City of Austin records · updated Sep 30, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 30, 2026
- since Aug 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExpress: replacement of 16 windows like for like
- AppliedSep 29, 2026
- IssuedSep 30, 2026
- WorkSep '26 – Mar '27
- Final inspection
2 contacts on this project · 2 phone numbers
Permit & project history
2 projectsExpress: replacement of 16 windows like for like
Express: replacement of 16 windows like for like
City of Austin permitBuilding PermitActive- Record
- 2026-128084 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace existing 150a main electrical panel with 200a main panel with disconnect and 200r bypass meter can installation of ev charger
Replace existing 150a main electrical panel with 200a main panel with disconnect and 200r bypass meter can installation of ev charger
City of Austin permitElectrical PermitActive- Record
- 2025-100887 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2715 Tether Trl
What work is permitted at 2715 Tether Trl?
Austin permits cover replacing 16 windows like for like, replacing the existing 150-amp main electrical panel with a 200-amp panel, and installing an EV charger.
Is a new home being built at 2715 Tether Trl?
The records provided show permits for window and electrical work, not a new home.
When was the window replacement permit filed?
The window replacement permit, 2026-128084 BP, was filed September 30, 2026.
When was the electrical permit filed at 2715 Tether Trl?
Permit 2025-100887 EP was filed August 15, 2025, for a main panel replacement and EV charger installation.
What electrical upgrades are planned at 2715 Tether Trl?
The permit describes replacing the existing 150-amp main panel with a 200-amp panel with a disconnect and 200-amp bypass meter can, and installing an EV charger.
Are the permits for 2715 Tether Trl active?
Both listed Austin permits are marked active in the records provided.
Also being built nearby
All of 78704- 2711 Tether TrlNov 12, 2024Condenser replacement only; like for like; 4 ton straight cool condenser fusible disconnect matched fuses & sizes leveled · 46 m away
- 2727 Tether TrlApr 4, 2025Addition/ remodel of 2 story sfr · 50 m away
- 2716 Tether TrlMar 7, 2024Installation of ev charger · 50 m away
- 2505 Mountain View DrApr 30, 2024Express: interior renovation-new flooring cabinets replace hvac bathroom and kitch repairs (not relocating plumbing) no structural work replace windows and doors like for like electrical work · 51 m away
- 2718 Tether TrlFeb 14, 2025Cap off of water and wastewater for a total demolition of sfr 4489 sq ft circa 1976 · 52 m away
- 2720 Tether TrlAug 14, 2026Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 2729 Tether TrlSep 26, 2025Replacement of complete existing central heat and air system with or without duct work · 62 m away
- 2722 Tether TrlDec 1, 2025Interior remodel interior renovation of lower including remodel of 2 bathrooms new windows and exterior doors will be installed in new rough rough openings mechanical equipment will be replaced with 2 new units · 70 m away
- 2509 Mountain View DrNov 5, 2026Base: installing a backup battery system and additional meter socket · 88 m away
- 2707 Tether TrlApr 15, 2024Replacement of mini-split system · 100 m away
- 2730 Tether TrlOct 26, 2026New 99 sq ft pool with autofill and ng heater revision: to add 6ft to the length of the pool · 105 m away
- 2705 Tether TrlOct 13, 2026Install a level 2 ev charger · 119 m away