3005 Pin Oak Ct
Austin, TX 78704
3005 Pin Oak Ct: 4 projects on record
City of Austin lists 4 filings across 4 projects at 3005 Pin Oak Ct, Austin, TX 78704 since July 9, 2024. The most recent, filed July 18, 2024, covers: “Irrigation for lawn”.
Compiled from City of Austin records · updated Jul 18, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Jul 18, 2024
- since Jul 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledIrrigation for lawn
- AppliedJul 6, 2021
- IssuedJul 18, 2024
- WorkJul '24 – Sep '24
- Final inspectionSep 20, 2024
Passed final inspection Sep 20, 2024.
1 contact on this project · 1 phone number
Permit & project history
4 projectsIrrigation for lawn
Irrigation for lawn
City of Austin permitPlumbing PermitFinal- Record
- 2024-086940 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new driveway approach of 16 ft. paid sidewalk fee in lieu
Construct new driveway approach of 16 ft. paid sidewalk fee in lieu
City of Austin permitDriveway / SidewalksFinal- Record
- 2021-164973 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Expedited review - new construction of a 2-story single-family residence [4bed 3.5bath] with habitable attic and attached 1-car garage
Expedited review - new construction of a 2-story single-family residence [4bed 3.5bath] with habitable attic and attached 1-car garage
City of Austin permitMechanical PermitFinal- Record
- 2021-164973 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Home builders loop ref: 2021-164973 ep
Home builders loop ref: 2021-164973 ep
City of Austin permitElectrical PermitFinal- Record
- 2022-013709 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3005 Pin Oak Ct
What is being built at 3005 Pin Oak Ct?
The latest filing (City of Austin permit 2024-086940 PP, July 18, 2024) covers irrigation for lawn.
How many permits and filings does 3005 Pin Oak Ct have?
4 filings across 4 projects, from July 9, 2024 to July 18, 2024.
Is there other construction near 3005 Pin Oak Ct?
Yes. Nearby filings include 3006 Pin Oak Ct (base: installing a backup battery system and additional meter socket, Oct 16, 2026); 3004 Pin Oak Ct (new pool, Dec 13, 2023); 3008 Pin Oak Ct (new in-ground pool 170sf concrete pool and associated equipment and pad, Oct 29, 2026).
How do I get alerts for new permits at 3005 Pin Oak Ct?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 3006 Pin Oak CtOct 16, 2026Base: installing a backup battery system and additional meter socket · 53 m away
- 3004 Pin Oak CtDec 13, 2023New pool · 55 m away
- 3008 Pin Oak CtOct 29, 2026New in-ground pool 170sf concrete pool and associated equipment and pad · 61 m away
- 2906 Burning Oak DrAug 4, 2026***timed virtual inspection: 08/19/2026 @ 10 am*** replacement of complete existing central heat and air system with or without duct work · 63 m away
- 3009 Burning Oak DrJul 22, 2026New pool (435 sq ft) with autofill/heating system and concrete decking (436 sq ft) · 84 m away
- 3015 Burning Oak DrApr 17, 2025Excavate 13 tunnel to repair main drain line under house serving one bathroom · 84 m away
- 1501 Cinnamon PathJan 24, 2025Replacement of complete existing central heat and air system with or without duct work · 84 m away
- 1505 Cinnamon PathNov 16, 2023Express: replace windows like for like · 100 m away
- 2907 Kinney AveMay 22, 2025Replacement of an existing water heater 50 gallon natural gas water heater change out · 102 m away
- 3014 Pin Oak CtFeb 10, 2026Repair and or replace plumbing lines with minimal surface disruption. correct drain underneath slab for both restrooms · 108 m away
- 1507 Cinnamon PathNov 11, 2025Express- remove existing siding to entire home and discard. install new james hardie fiber cement siding. remove existing windows and replace with mi-p white vinyl double glass low- e windows · 110 m away
- 3003 Leaning Oak CirJun 13, 2025This estimate is to expose the sewer system under the home approximately 65ft of pipe will be exposed and replaced. we will also install hangers to support the system and prevent movement of the lines. once the system is replaced we ill put system on test and have city inspector check the installation once we are completed. the line will be replaced with new 3in and 2in pvc · 117 m away