303 Woodward St
Austin, TX 78704
303 Woodward St: 1 project on record
City of Austin lists 1 filing across 1 project at 303 Woodward St, Austin, TX 78704. The most recent, filed December 2, 2022, covers: “Woodward industrial district resubdivision of part of lot 54 & wests 1/2 of lot 55”.
Compiled from City of Austin records · updated Dec 2, 2022
- Projects
- 1
- 1 filings
- Latest filing
- Dec 2, 2022
- since Dec 2, 2022
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 303 Woodward St
What is being built at 303 Woodward St?
The latest filing (City of Austin case 12106139, December 2, 2022) covers woodward industrial district resubdivision of part of lot 54 & wests 1/2 of lot 55.
How many permits and filings does 303 Woodward St have?
1 filing across 1 project, from December 2, 2022 to December 2, 2022.
What is being built near Women's Professional Volleyball Training Facility in Austin?
303 Woodward St is about 193 m from Women's Professional Volleyball Training Facility (425 Woodward St). Its latest filing is for woodward industrial district resubdivision of part of lot 54 & wests 1/2 of lot 55.
Is there other construction near 303 Woodward St?
Yes. Nearby filings include 301 Woodward St (install evse, Apr 11, 2024); 304 Braeswood Rd (replacement of mini-split system, Aug 12, 2025); 3408 Willow Springs Rd (removing and replacing electrical panel with a new 200amp 30 space electrical panel and breakers along with a surge protector. we will use 4/0 aluminum wire for our run from the meter to the panel, May 7, 2024).
How do I get alerts for new permits at 303 Woodward St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 301 Woodward StApr 11, 2024Install evse · 22 m away
- 304 Braeswood RdAug 12, 2025Replacement of mini-split system · 95 m away
- 3408 Willow Springs RdMay 7, 2024Removing and replacing electrical panel with a new 200amp 30 space electrical panel and breakers along with a surge protector. we will use 4/0 aluminum wire for our run from the meter to the panel · 96 m away
- 3410 Willow Springs RdJul 22, 2025Replace approximately 40ft of water service yard line · 104 m away
- 3412 Willow Springs RdDec 19, 2023Express: unit a. window replacement size for size · 114 m away
- 3405 Woodleigh StJan 8, 2024Replacing yard line from meter to home · 133 m away
- 3405 Willow Springs RdOct 3, 2024Relocation of 2 story sfr circa 1941 outside the city · 141 m away
- 3409 Willow Springs RdApr 27, 2018Resubdivision of lot 2, woodwillow addition (with r c8-2016-0117.0a) · 167 m away
- 425 Woodward St · Women's Professional Volleyball Training FacilityFeb 10, 2025Partial renovation of existing indoor sports facility. contractors added two fire dampers need to be revised · 193 m away
- 121 Woodward StSep 3, 2024Install metal roof over existing composite shingles · 217 m away
- 118 Alpine RdMar 2, 2007Howard systems receiving and shipping docks · 252 m away
- 3601 Willow Springs RdJan 18, 2024Emergency repair: replaced service conductors and weather head because they burnt-up · 270 m away