318 Le Grande Ave

Austin, TX 78704

Rooftop solar and battery permitted at 318 Le Grande Ave

Permits indicate a 15.01-kW rooftop solar system and 13.5-kW energy storage system for the existing residence at 318 Le Grande Ave, filed April 30, 2024. A later permit filed January 28, 2026, covers replacement of the home's central heating and air system with two heat pumps; that permit is marked final.

Summarized from City of Austin records · updated Jan 28, 2026

Projects
3
3 filings
Latest filing
Jan 28, 2026
since Apr 30, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work insulation of 2 heat pump systems

  1. AppliedNov 17, 2025
  2. IssuedJan 28, 2026
  3. WorkJan '26 – Apr '26
  4. Final inspectionApr 3, 2026

Passed final inspection Apr 3, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. Replacement of complete existing central heat and air system with or without duct work insulation of 2 heat pump systems

    Replacement of complete existing central heat and air system with or without duct work insulation of 2 heat pump systems

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install new 15.010kw rooftop solar system and 13.5kw energy storage system for existing residential only

    Install new 15.010kw rooftop solar system and 13.5kw energy storage system for existing residential only

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    Disconnect/reconnect power to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size

    City of Austin permitElectrical PermitWithdrawn
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 318 Le Grande Ave

What is being built at 318 Le Grande Ave?

City of Austin records show work on an existing residence: a rooftop solar system with energy storage and a replacement central heating and air system. The records do not indicate a new building.

Is solar being installed at 318 Le Grande Ave in Austin?

A City of Austin electrical permit filed April 30, 2024, describes a new 15.01-kW rooftop solar system and 13.5-kW energy storage system for the existing residence. Permit 2024-053190 EP is marked final.

Is there a battery system planned for 318 Le Grande Ave?

The April 30, 2024, permit describes a 13.5-kW energy storage system alongside the rooftop solar installation. Permit 2024-053190 EP is marked final.

What heating and air work is permitted at 318 Le Grande Ave?

Permit 2025-147553 MP, filed January 28, 2026, covers replacement of the existing central heat and air system with two heat pumps. The permit is marked final.

When were permits filed for work at 318 Le Grande Ave?

The solar and energy storage permit was filed April 30, 2024. The heat pump replacement permit was filed January 28, 2026.

Was the electrical permit for 318 Le Grande Ave approved?

The solar and energy storage permit, 2024-053190 EP, is marked final. A separate permit for disconnecting and reconnecting power to tie in the solar and storage components, 2024-053194 EP, was withdrawn.