3202 Overcup Oak Dr
Austin, TX 78704
3202 Overcup Oak Dr: 4 projects on record
City of Austin lists 4 filings across 4 projects at 3202 Overcup Oak Dr, Austin, TX 78704 since August 5, 2024. The most recent, filed November 6, 2024, covers: “Garage conversion and interior remodel. replace all windows with new”.
Compiled from City of Austin records · updated Nov 6, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Nov 6, 2024
- since Aug 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledGarage conversion and interior remodel. replace all windows with new
- AppliedApr 8, 2024
- IssuedNov 6, 2024
- WorkNov '24 – May '25
- Final inspectionMay 9, 2025
Passed final inspection May 9, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projectsGarage conversion and interior remodel. replace all windows with new
Garage conversion and interior remodel. replace all windows with new
City of Austin permitMechanical PermitFinal- Record
- 2024-063266 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Garage conversion and interior remodel. replace all windows with new
Garage conversion and interior remodel. replace all windows with new
City of Austin permitPlumbing PermitFinal- Record
- 2024-063266 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Garage conversion and interior remodel. replace all windows with new
Garage conversion and interior remodel. replace all windows with new
City of Austin permitElectrical PermitFinal- Record
- 2024-063266 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Garage conversion and interior remodel. replace all windows with new
Garage conversion and interior remodel. replace all windows with new
City of Austin permitBuilding PermitFinal- Record
- 2024-063266 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3202 Overcup Oak Dr
What is being built at 3202 Overcup Oak Dr?
The latest filing (City of Austin permit 2024-063266 MP, November 6, 2024) covers garage conversion and interior remodel. replace all windows with new.
How many permits and filings does 3202 Overcup Oak Dr have?
4 filings across 4 projects, from August 5, 2024 to November 6, 2024.
Is there other construction near 3202 Overcup Oak Dr?
Yes. Nearby filings include 3204 Overcup Oak Dr (express: foundation repair, Mar 26, 2026); 3205 Overcup Oak Dr (23.65 kw dc roof mount solar system, Aug 27, 2024); 3207 Overcup Oak Dr (new in-ground pool (513 sq ft), Aug 4, 2025).
How do I get alerts for new permits at 3202 Overcup Oak Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 3204 Overcup Oak DrMar 26, 2026Express: foundation repair · 25 m away
- 3205 Overcup Oak DrAug 27, 202423.65 kw dc roof mount solar system · 59 m away
- 3207 Overcup Oak DrAug 4, 2025New in-ground pool (513 sq ft) · 64 m away
- 3015 Burning Oak DrApr 17, 2025Excavate 13 tunnel to repair main drain line under house serving one bathroom · 74 m away
- 3209 Overcup Oak DrMar 6, 2024Interior remodel of kitchen & 2 bathrooms converting existing porch into condition space · 76 m away
- 3014 Pin Oak CtFeb 10, 2026Repair and or replace plumbing lines with minimal surface disruption. correct drain underneath slab for both restrooms · 77 m away
- 3009 Burning Oak DrJul 22, 2026New pool (435 sq ft) with autofill/heating system and concrete decking (436 sq ft) · 102 m away
- 3213 Overcup Oak DrNov 30, 2023Frame box out for new vent fireplace. 2 new windows change siding and insulation. retro permitting existing deck · 105 m away
- 3204 South Oak DrMar 5, 2025Replacement of complete existing central heat and air system with or without duct work · 110 m away
- 3208 South Oak DrFeb 27, 2025Replacement of complete existing central heat and air system with or without duct work replace 3 ton gas system with new basic seer2 goodman. new gsxn4 condenser coil and gm9s furnace on puron refrigerant. remove and dispose of old equipment. new ecobee3 wifi thermostat · 121 m away
- 3008 Pin Oak CtOct 29, 2026New in-ground pool 170sf concrete pool and associated equipment and pad · 127 m away
- 3006 Pin Oak CtOct 16, 2026Base: installing a backup battery system and additional meter socket · 146 m away