330 Ben White Blvd Svrd
Austin, TX 78704
Site-plan resubmittal for South Austin rehabilitation hospital
A site-plan resubmittal for Reliant Rehabilitation Hospital South Austin was filed at 330 Ben White Blvd Svrd on April 24, 2026. The City of Austin case is closed; the record does not confirm that construction has started or that the hospital is opening.
Summarized from City of Austin records · updated Apr 24, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 24, 2026
- since Mar 26, 2009
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 330 Ben White Blvd Svrd
What is being built at 330 Ben White Blvd Svrd?
A City of Austin site-plan case names Reliant Rehabilitation Hospital South Austin. A resubmittal was filed on April 24, 2026, and the case is marked closed.
Is a rehabilitation hospital planned for 330 Ben White Blvd Svrd?
City records show a site-plan case for Reliant Rehabilitation Hospital South Austin, including a resubmittal filed April 24, 2026. The records provided do not confirm construction or an opening date.
When was the latest case filed for the South Austin rehabilitation hospital?
The latest listed filing is dated April 24, 2026. It is a resubmittal of site-plan case SPC-2007-0723C, case number 10250890.
Was the original hospital site plan approved?
The earlier City of Austin case, number 10100419, was filed March 26, 2009, and is marked withdrawn. A later resubmittal was filed in 2026 and is marked closed.
Is the hospital next to 321 West Ben White Boulevard?
The proposed site at 330 Ben White Blvd Svrd is about 278 meters from the nearby record for 321 West Ben White Boulevard, Suites 201 and 202. That record concerns fire restoration.
When will Reliant Rehabilitation Hospital South Austin open?
The records provided do not give an opening date. They list a site-plan resubmittal filed April 24, 2026, with the case marked closed.
Also being built nearby
All of 78704- 405 Krebs LnNov 25, 2025New pool with required enclosure (unclear if heater of autofill) · 95 m away
- 3813 Wilson StFeb 26, 2025Install evse · 103 m away
- 409 Krebs LnJan 24, 2025Expedited review: new construction of a 2-story single family res [4bed 3.5bath] with attached garage · 115 m away
- 3809 Wilson StAug 26, 2024Install 23 (390w) roof mounted solar panels 8.970 kw solar service system tying into existing 200 amp rated msp · 117 m away
- 411 Krebs LnFeb 4, 2025Expedited review: new construction of pool for single family residence · 129 m away
- 412 Krebs LnNov 10, 2026Eplan: residential expedited review - new autofill/heated pool with spa · 174 m away
- 500 W Ben White Blvd Svrd WbDec 23, 2024Extend power from panels h2 and l1 section 2 to connection point a mobile equipment trailer (no plumbing) · 184 m away
- 414 Krebs LnMay 22, 2026Emergency riser & meter replacement after tree fell on drop · 184 m away
- 321 W Ben White Blvd Svrd EbDec 14, 2023Remove/replace existing soffits and sownlights with new led - building c · 192 m away
- 405 Post Road DrJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 193 m away
- 409 W Ben White Blvd Svrd EbOct 1, 2024Repair/ replace gas line · 196 m away
- 429 W Ben White Blvd Svrd EbAug 19, 2026Change of use to food sales/cafe selling cakes and serving cake slices and pastries. no food preparation. all food prepared offsite · 200 m away