3603 Southridge Dr
Austin, TX 78704
Bainbridge amenity center site plan and HVAC replacement
City records identify a Bainbridge amenity center at 3603 Southridge Dr. A site-plan case for the amenity center was approved and released on August 18, 2021; a June 3, 2024 mechanical permit covers replacement of the existing central heating and air system and is marked final.
Summarized from City of Austin records · updated Jun 3, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Jun 3, 2024
- since Nov 15, 2018
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 3, 2024
- IssuedJun 3, 2024
- WorkJun '24 – Jun '24
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-069267 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3603 Southridge Dr
What is being built at 3603 Southridge Dr in Austin?
City records identify a Bainbridge amenity center at this address. They show an amenity-center site plan approved and released on August 18, 2021, but do not specify new construction.
What is the Bainbridge amenity center project?
The City of Austin has a site-plan case named “Bainbridge Amenity Center (W/R SP-2018-0578C),” approved and released on August 18, 2021.
Was a permit issued for work at 3603 Southridge Dr?
A City of Austin mechanical permit, 2024-069267 MP, was filed June 3, 2024, for replacement of the complete existing central heating and air system, with or without duct work. Its status is final.
Is the work at 3603 Southridge Dr new construction?
The records show a site-plan case for the Bainbridge amenity center and a 2024 permit to replace an existing heating and air system. They do not specify that a new building is being constructed.
Were there earlier plans for Bainbridge Villas amenity center improvements?
Yes. A site-plan case filed November 15, 2018, expired, and a case filed April 3, 2020, was withdrawn. A later amenity-center site-plan case was approved and released on August 18, 2021.
Also being built nearby
All of 78704- 1402 Valleyridge CirOct 17, 2024Express: foundation repair · 139 m away
- 1400 Southport DrMar 14, 2025Replacement of an existing water heater · 148 m away
- 1402 Southport DrDec 22, 2025Express - replace 6 exterior windows 2 sliding doors 2 front doors with like size. replace 1 bathroom tub/shower combo with like size replace cabinenets in kitchen paint flooring- no plubing fixtures being moved. replacing cedar ciding on exterior wit · 149 m away
- 1320 Southport DrNov 7, 2024Replacement of an existing water heater · 169 m away
- 1315 Southport DrSep 2, 2024Express: window replacement (like for like) roof repair exempt work (cabinets countertops flooring paint) · 176 m away
- 1312 Southport DrJul 7, 2025Repairs on yard water line connected to apartments a b c d · 189 m away
- 3404 Dolphin DrSep 2, 2024Emergency: lugs and meter socket failed and loss of power on unit #2. rebuild and upgrade duplex overhead service to (2) 125a services · 195 m away
- 1202 Southport DrMay 12, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system · 214 m away
- 1205 Southport DrOct 20, 2026Replacement of an existing water heater replace 30 gal electric water heater · 222 m away
- 1501 Rockdale CirJan 13, 2026Address is 1501 rockdale circle austin tex 78704. the tenant was experiencing flickering lights austin energy was called by property management and pulled the meter. one of the lugs was burned so i repaired the meter · 226 m away
- 3300 Dolphin CvSep 12, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton vertical gas system · 230 m away
- 3301 Dolphin CvApr 20, 2026Interior remodel - no increase in square footage. the project will include new sheathing exterior insulation and rainscreen cladding. the project will also be adding slab edge insulation additional rafters for added insulation and exterior top side roof insulation. the home will be all electric. existing gas line will be abandoned at the street. also to include: detaching the garage efficient windows and doors new high efficiency mechanical systems all new plumbing and electrical new landscape pavers new wood deck prewire for future solar. all expired permits will be resolved as part of this renovation · 233 m away