407 Cherry Hill Dr
Austin, TX 78704
407 Cherry Hill Dr: 4 projects on record
City of Austin lists 4 filings across 4 projects at 407 Cherry Hill Dr, Austin, TX 78704 since March 2, 2022. The most recent, filed April 11, 2022, covers: “Install an irrigation system to permit address”.
Compiled from City of Austin records · updated Apr 11, 2022
- Projects
- 4
- 4 filings
- Latest filing
- Apr 11, 2022
- since Mar 2, 2022
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall an irrigation system to permit address
- AppliedFeb 28, 2022
- IssuedSep 21, 2023
- WorkSep '23 – Sep '23
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
Permit & project history
4 projectsInstall an irrigation system to permit address
Install an irrigation system to permit address
City of Austin permitPlumbing PermitFinal- Record
- 2023-120954 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Install an irrigation system to permit address
Install an irrigation system to permit address
City of Austin permitPlumbing PermitFinal- Record
- 2023-120949 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 407 Cherry Hill Dr
What is being built at 407 Cherry Hill Dr?
The latest filing (City of Austin permit 2023-120954 PP, September 21, 2023) covers install an irrigation system to permit address.
How many permits and filings does 407 Cherry Hill Dr have?
4 filings across 4 projects, from March 2, 2022 to April 11, 2022.
Is there other construction near 407 Cherry Hill Dr?
Yes. Nearby filings include 408 Cherry Hill Dr (thorough remodeling of ground floor and addition of a new second floor directly on top of ground floor that is identical in size and shape to the ground floor. the ground floor will hold a total of 1 bedroom and 1.5 bathrooms and the second floor will have 3 bedrooms and 2 bathrooms upon completion, Nov 12, 2026); 403 Cherry Hill Dr (cap off water and waste water, Mar 10, 2026); 406 Post Road Dr (replacement of complete existing central heat and air system with or without duct work replace existing 2-ton horizontal gas hvac system, Nov 9, 2026).
How do I get alerts for new permits at 407 Cherry Hill Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 408 Cherry Hill DrNov 12, 2026Thorough remodeling of ground floor and addition of a new second floor directly on top of ground floor that is identical in size and shape to the ground floor. the ground floor will hold a total of 1 bedroom and 1.5 bathrooms and the second floor will have 3 bedrooms and 2 bathrooms upon completion · 30 m away
- 403 Cherry Hill DrMar 10, 2026Cap off water and waste water · 38 m away
- 406 Post Road DrNov 9, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 2-ton horizontal gas hvac system · 54 m away
- 406 Cherry Hill DrAug 3, 2024Replace water service line · 58 m away
- 3707 Wilson StMay 6, 2024Emergency permit - repair and relocate service. ***per contractor tree knocked over service need to repair and remount · 85 m away
- 405 Post Road DrJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 105 m away
- 3605 Tallison TerJul 1, 2026Irrigation install · 126 m away
- 3602 Tallison TerJun 5, 2024Install a 200 amp temporary meter loop for the builder ref: 2023-082272 bp · 134 m away
- 412 Krebs LnNov 10, 2026Eplan: residential expedited review - new autofill/heated pool with spa · 161 m away
- 507 Post Road DrOct 15, 2025Excavate 45 tunnel to repair drain line under house · 162 m away
- 3601 Tallison TerSep 11, 2024Upgrading service from 2 meters to 1 meter. we will need to relocate the meter socket. existing service tis inside of a cabinet/shed outside of home and one socket is covered in plywood · 165 m away
- 414 Krebs LnMay 22, 2026Emergency riser & meter replacement after tree fell on drop · 170 m away