groundranger
Recent · latest filing Aug 2026Residential

410 W Alpine Rd

Austin, TX 78704

410 W Alpine Rd permits cover HVAC and EV charger work

City of Austin records show a replacement central heating and air system was permitted at 410 W Alpine Rd on August 5, 2025. A Level 2 EV charger was permitted on August 7, 2026; both permits are marked final.

Summarized from City of Austin records · updated Aug 7, 2026

Projects
2
2 filings
Latest filing
Aug 7, 2026
since Aug 5, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Install level 2 ev charger

  1. AppliedAug 5, 2026
  2. IssuedAug 7, 2026
  3. WorkAug '26 – Feb '27
  4. Final inspectionAug 13, 2026

Passed final inspection Aug 13, 2026.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Install level 2 ev charger

    Install level 2 ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork

    Replacement of complete existing central heat and air system with or without duct work removed the old unit and installed 1 new hvac system without ductwork

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 410 W Alpine Rd

What is being built at 410 W Alpine Rd in Austin?

The listed permits cover replacement of the central heating and air system and installation of a Level 2 EV charger. They do not describe a new building.

Is a new EV charger being installed at 410 W Alpine Rd?

A City of Austin electrical permit describes installation of a Level 2 EV charger. Permit 2026-101385 EP was filed August 7, 2026, and is marked final.

What HVAC work is planned at 410 W Alpine Rd?

A mechanical permit describes replacing the existing central heat and air system without ductwork. Permit 2025-097455 MP was filed August 5, 2025, and is marked final.

When were the permits filed for 410 W Alpine Rd?

The HVAC permit was filed August 5, 2025, and the EV charger permit was filed August 7, 2026.

Are the 410 W Alpine Rd permits final?

Yes. Both City of Austin permits listed for the address are marked final.

Also being built nearby

All of 78704
Email me when a new permit is filed