508 Lockhart Dr
Austin, TX 78704
508 Lockhart Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 508 Lockhart Dr, Austin, TX 78704. The most recent, filed November 5, 2024, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Nov 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 5, 2024
- since Nov 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedOct 25, 2024
- IssuedNov 5, 2024
- WorkNov '24 – May '25
- Final inspectionNov 7, 2024
Passed final inspection Nov 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-143784 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 508 Lockhart Dr
What is being built at 508 Lockhart Dr?
The latest filing (City of Austin permit 2024-143784 EP, November 5, 2024) covers install level 2 ev charger.
How many permits and filings does 508 Lockhart Dr have?
1 filing across 1 project, from November 5, 2024 to November 5, 2024.
Is there other construction near 508 Lockhart Dr?
Yes. Nearby filings include 516 Lockhart Dr (addition/remodel. addition of an expanded bedroom and a new bathroom to rear of existing noncomplying 1-story single family residence. reconfigure interior layout and remove portion of existing uncovered wood deck to accommodate addition. addition/remodel will result in a 2 bedroom 2 bathroom single family residence, Oct 14, 2026); 513 Lockhart Dr (addition partial demolition to front of structure expanding conditioned space of existing 1st floor for kitchen and living room space addition of front porch new windows on 2nd floor master bed per plans expansion of driveway past the property line (no row work proposed) addition of lower level garage underneath proposed addition that will not affect impervious cover or total building, Jun 5, 2025); 505 Lockhart Dr (replace sewer line from house to tap, May 13, 2024).
How do I get alerts for new permits at 508 Lockhart Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 516 Lockhart DrOct 14, 2026Addition/remodel. addition of an expanded bedroom and a new bathroom to rear of existing noncomplying 1-story single family residence. reconfigure interior layout and remove portion of existing uncovered wood deck to accommodate addition. addition/remodel will result in a 2 bedroom 2 bathroom single family residence · 14 m away
- 513 Lockhart DrJun 5, 2025Addition partial demolition to front of structure expanding conditioned space of existing 1st floor for kitchen and living room space addition of front porch new windows on 2nd floor master bed per plans expansion of driveway past the property line (no row work proposed) addition of lower level garage underneath proposed addition that will not affect impervious cover or total building · 15 m away
- 505 Lockhart DrMay 13, 2024Replace sewer line from house to tap · 15 m away
- 503 Lockhart DrOct 7, 2025Express: kitchen plumbing fixture replacement like for like switching conventional water heater to tankless outside · 17 m away
- 503 E Mary StApr 7, 2026Addition - addition of mudroom laundry room primary bedroom & bath and family room. interior remodel of kitchen dining room and second floor remodel to create bathroom · 66 m away
- 1906 Newning AveMar 22, 2024Replacement of complete existing central heat and air system with or without duct work · 81 m away
- 502 Terrace DrSep 30, 2026Replacement of complete existing central heat and air system with or without duct work *2 systems* like for like 2.5 ton horizontal gas 2 ton horizontal gas · 86 m away
- 500 Terrace DrApr 28, 2026Interior remodel of existing living space. kitchen reconfiguration removing several non-loadbearing walls · 86 m away
- 509 E Mary StAug 28, 2025Pool complete app received 12/16 · 88 m away
- 506 Terrace DrDec 22, 2024Express: all work to be done on back shed only. size 19.2 x 17.8. replace approximately 390sf of asphalt shingle roofing with corrugated corten. replace wood siding with cement board siding (approx 300 sft of siding) · 95 m away
- 402 Lockhart DrJul 8, 2024*partial demolition* addition/remodel of 2-story sfr 3 bed/4bath · 96 m away
- 400 Lockhart DrJul 21, 2025Replacement of complete existing central heat and air system with or without duct work · 97 m away