700 Dawson Rd
Austin, TX 78704
HighRoad site plan approved at 700 Dawson Rd
City of Austin records show a HighRoad CUP site plan at 700 Dawson Rd was approved and released on January 8, 2026. A related subdivision case, filed October 24, 2025, is awaiting recordation; the records do not specify building size or project cost.
Summarized from City of Austin records · updated Jan 8, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 8, 2026
- since Oct 24, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 700 Dawson Rd
What is being planned at 700 Dawson Rd in Austin?
City records show a HighRoad CUP site plan case, approved and released on January 8, 2026. The records do not describe the proposed building or use.
Has the HighRoad site plan at 700 Dawson Rd been approved?
Yes. City of Austin case 13408932, named HighRoad CUP, has a status of Approved and Released as of January 8, 2026.
Is there a subdivision planned at 700 Dawson Rd?
A High Road Subdivision case was filed on October 24, 2025. Its status is Awaiting Recordation.
What does the HighRoad CUP case say about construction at 700 Dawson Rd?
The record identifies a site plan case and says it was approved and released on January 8, 2026. It does not provide construction details or a building size.
How much will the 700 Dawson Rd project cost?
The available City of Austin records do not report a project cost.
When were the 700 Dawson Rd cases filed?
The High Road Subdivision case was filed October 24, 2025, and the HighRoad CUP site plan case was filed January 8, 2026.
Also being built nearby
All of 78704- 916 Retama StNov 14, 2025Install new 13.2 kw dc rooftop solar system to existing residential · 74 m away
- 911 Retama StMar 18, 2026Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 911 Post Oak StJul 30, 2026New 2-story 3 bedroom 2.5 bathroom single family residence with habitable basement attached carport covered porches and balcony · 135 m away
- 909 Post Oak StSep 21, 2026Ruptured gas line - the repair involves excavating 34 feet to replace the damaged gas line with the possibility of extending the replacement if the existing pipe is unsuitable for tie-in · 148 m away
- 516 Dawson RdFeb 2, 2026Repair gas leak under parking lot · 153 m away
- 908 Post Oak StMar 19, 2025Install (1) 60 amp 240 volt tesla wall connect · 156 m away
- 906 Ebony StOct 14, 2026Aux power - deinstallation/reinstallation of the pv meter · 161 m away
- 1005 Daniel DrJan 24, 2025Replacement of complete existing central heat and air system with or without duct work 10/30 @ 8am in person · 162 m away
- 901 Dawson RdFeb 14, 2025Replacement of an existing water heater replacement of 2 existing tankless water heaters · 162 m away
- 907 Post Oak StNov 6, 2026Replacement of complete existing central heat and air system with or without duct work · 163 m away
- 906 Post Oak StNov 17, 2023Cap off of water & sewer for a total demolition of a dwelling · 170 m away
- 904 Retama StFeb 27, 2025Install evse · 171 m away