710 Cardinal Ln
Austin, TX 78704
710 Cardinal Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 710 Cardinal Ln, Austin, TX 78704. The most recent, filed May 17, 2013, covers: “Red bird subdivision”.
Compiled from City of Austin records · updated May 17, 2013
- Projects
- 1
- 1 filings
- Latest filing
- May 17, 2013
- since May 17, 2013
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 710 Cardinal Ln
What is being built at 710 Cardinal Ln?
The latest filing (City of Austin case 10848069, May 17, 2013) covers red bird subdivision.
How many permits and filings does 710 Cardinal Ln have?
1 filing across 1 project, from May 17, 2013 to May 17, 2013.
Is there other construction near 710 Cardinal Ln?
Yes. Nearby filings include 720 Cardinal Ln (replacement of complete existing central heat and air system with or without duct work, Aug 23, 2024); 712 Cardinal Ln (replacement of complete existing central heat and air system with or without duct work, Apr 9, 2025); 708 Cardinal Ln (replacement of complete existing central heat and air system with or without duct work, Dec 2, 2025).
How do I get alerts for new permits at 710 Cardinal Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 720 Cardinal LnAug 23, 2024Replacement of complete existing central heat and air system with or without duct work · 12 m away
- 712 Cardinal LnApr 9, 2025Replacement of complete existing central heat and air system with or without duct work · 18 m away
- 708 Cardinal LnDec 2, 2025Replacement of complete existing central heat and air system with or without duct work · 33 m away
- 707 Cardinal LnAug 18, 2025Replacement of an existing water heater replacing 50gal electric water heater · 55 m away
- 615 Cardinal LnMar 2, 2007Mercury hall · 74 m away
- 900 Cardinal LnNov 19, 2007Austin energy - cardinal lane substation · 123 m away
- 905 Cardinal LnNov 10, 2026Replace existing water heater with new tankless water heater reconnecting water gas and venting; no structural changes; no logistics specified · 146 m away
- 606 Cardinal LnJun 12, 2024864 sq ft residential home requires service to be upgraded & brought to code · 150 m away
- 706 Gamez CvNov 4, 2024Replacement of complete existing central heat and air system with or without duct work · 151 m away
- 903 Cardinal LnAug 14, 2026Install level 2 ev charger · 165 m away
- 711 Limon LnJun 5, 2024Replacement of complete existing central heat and air system with or without duct work · 166 m away
- 601 Cardinal LnJan 7, 2026601 cardinal lane · 170 m away