800 Jessie St
Austin, TX 78704
EV charger circuit and HVAC replacement at 800 Jessie St
Austin permits indicate electrical work for an EV charger and replacement of the existing central heating and air system at this residence. The HVAC permit was filed December 4, 2025, and the EV charger circuit permit was filed August 18, 2026; both are marked final.
Summarized from City of Austin records · updated Aug 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Aug 18, 2026
- since Dec 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRun new 50 amp circuit from main panel for new ev charger in garage
- AppliedJul 7, 2026
- IssuedAug 18, 2026
- WorkAug '26 – Aug '26
- Final inspectionAug 24, 2026
Passed final inspection Aug 24, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRun new 50 amp circuit from main panel for new ev charger in garage
Run new 50 amp circuit from main panel for new ev charger in garage
City of Austin permitElectrical PermitFinal- Record
- 2026-086998 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-135040 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 800 Jessie St
What work is happening at 800 Jessie St in Austin?
Permits indicate a new 50-amp circuit for an EV charger in the garage and replacement of the existing central heat and air system.
Is a new home being built at 800 Jessie St?
The records provided show permits for home improvements, not a new home: HVAC replacement and an EV charger circuit.
When was the EV charger permit filed for 800 Jessie St?
The City of Austin electrical permit, 2026-086998 EP, was filed August 18, 2026. It is marked final.
What HVAC work was permitted at 800 Jessie St?
Permit 2025-135040 MP covers replacement of the existing central heating and air system with a like-for-like 3-ton horizontal gas system. It was filed December 4, 2025, and is marked final.
Is the work at 800 Jessie St commercial or residential?
The fact sheet classifies the address as residential. The listed permits are for home electrical and mechanical work.
Also being built nearby
All of 78704- 1507 Juliet StMay 15, 2026Irrigation install · 40 m away
- 801 Jessie StAug 27, 2026Replacing meter can riser and grounding. also install of surge protection. like for like · 43 m away
- 803 Jessie StMay 21, 2025Tunnel under the foundation and use sch 40 pvc to replace cast iron lines in the kitchen laundry and bathroom · 45 m away
- 805 Jessie StAug 14, 2024Install evse · 50 m away
- 1408 Juliet StDec 17, 2024Dig up and replace sewer yard line from house to city tap and approximately 8 of sewer trunk line under pier and beam house · 54 m away
- 1506 Juliet StJan 2, 2025Express: repairs due to fire damage · 55 m away
- 808 Jessie StNov 3, 2025New residential irrigation · 57 m away
- 1406 Juliet StAug 17, 2026New pool · 65 m away
- 1404 Juliet StJan 11, 2024Replacement of an existing gas water heater · 79 m away
- 809 Ethel StNov 6, 2026Base: installing a backup battery system and additional meter socket · 86 m away
- 1402 Juliet StSep 3, 2026Installing dedicated gas supply to pull heater · 90 m away
- 901 Jessie StJul 29, 2026Upgrading the full electrical wall · 98 m away