Eight steel piles permitted at an existing restaurant on S Lamar

City of Austin permits indicate work at an existing restaurant at 801 S Lamar Blvd, including eight steel piles to prevent future downward movement of the slab. The pile installation permit, 2026-146857 BP, was filed November 9, 2026, and is active. A plumbing permit to replace a backflow preventer was filed May 21, 2026, and is final.

Summarized from City of Austin records · updated Nov 9, 2026

Projects
2
2 filings
Latest filing
Nov 9, 2026
since May 21, 2026
Largest scope
—
Listed value
—

Where this project stands

Permit active · work underway

Installation of eight steel piles to prevent future downward movement of the slab for existing restaurant

  1. AppliedNov 4, 2026
  2. IssuedNov 9, 2026
  3. WorkNov '26 – May '27
  4. Final inspection
6% through of the permit windowNov 9, 2026 → May 9, 2027

2 contacts on this project · 2 phone numbers

Permit & project history

2 projects
  1. Installation of eight steel piles to prevent future downward movement of the slab for existing restaurant

    Installation of eight steel piles to prevent future downward movement of the slab for existing restaurant

    City of Austin permitBuilding PermitActive
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replace 3/4 rpz on back wall behind combi oven

    Replace 3/4 rpz on back wall behind combi oven

    City of Austin permitPlumbing PermitFinal
    Tenant / owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 801 S Lamar Blvd

What is being built at 801 S Lamar Blvd?

The permits describe work at an existing restaurant, not a new building: installation of eight steel piles to prevent future downward movement of the slab.

Is a new restaurant opening at 801 S Lamar Blvd?

The records provided do not indicate a new restaurant opening. The November 9, 2026 permit describes work at an existing restaurant.

Why are steel piles being installed at 801 S Lamar Blvd?

Permit 2026-146857 BP says the eight piles are intended to prevent future downward movement of the slab.

When was work permitted at 801 S Lamar Blvd?

The steel-pile permit was filed November 9, 2026. A separate plumbing permit was filed May 21, 2026.

What is the status of the 801 S Lamar Blvd permits?

The steel-pile building permit, 2026-146857 BP, is active. Plumbing permit 2026-062955 PP is final.

What plumbing work is permitted at 801 S Lamar Blvd?

Permit 2026-062955 PP covers replacing a 3/4-inch RPZ on the back wall behind a combi oven. It was filed May 21, 2026, and is final.