806 Josephine St
Austin, TX 78704
Residential repairs and HVAC replacement at 806 Josephine St
City of Austin permits indicate repairs and system replacement at the existing residential property, rather than a documented new build. The latest filing, dated September 10, 2026, covers replacement of the complete central heating and air system, with or without duct work.
Summarized from City of Austin records · updated Sep 10, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Sep 10, 2026
- since May 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayReplacement of complete existing central heat and air system with or without duct work
- AppliedSep 7, 2026
- IssuedSep 10, 2026
- WorkSep '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
4 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitActive- Record
- 2026-117128 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-138529 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitExpired- Record
- 2024-139460 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2024-056375 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 806 Josephine St
What is happening at 806 Josephine St in Austin?
City permit records show residential repair and replacement work, including foundation repairs and replacement of the central heating and air system. They do not document a new building.
Is a new home being built at 806 Josephine St?
The permits in these records describe repairs and system replacements at an existing property, not new home construction.
What does the latest permit for 806 Josephine St cover?
Permit 2026-117128 MP, filed September 10, 2026, covers replacement of the complete existing central heating and air system, with or without duct work. Its status is listed as Active.
Were foundation repairs permitted at 806 Josephine St?
Yes. City records show express foundation repair permits filed May 6, 2024, and October 27, 2025. Both are listed as Final.
Was a water heater replacement permitted at 806 Josephine St?
A permit for replacing an existing water heater was filed October 31, 2024. The permit is listed as Expired.
When was the most recent permit filed for 806 Josephine St?
The latest filing was September 10, 2026, for replacement of the existing central heating and air system. It is permit 2026-117128 MP.
Also being built nearby
All of 78704- 807 Josephine StJun 20, 2024Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 805 Jessie StAug 14, 2024Install evse · 49 m away
- 901 Josephine StNov 14, 2023Basic irrigation for trees and grass. 2 zones · 51 m away
- 803 Jessie StMay 21, 2025Tunnel under the foundation and use sch 40 pvc to replace cast iron lines in the kitchen laundry and bathroom · 55 m away
- 904 Josephine StFeb 7, 2024Replacement of complete existing central heat and air system with or without duct work · 60 m away
- 801 Jessie StAug 27, 2026Replacing meter can riser and grounding. also install of surge protection. like for like · 65 m away
- 901 Jessie StJul 29, 2026Upgrading the full electrical wall · 66 m away
- 1309 Juliet StMay 1, 2026We had an emergency outage as a tree fell on an incoming line which ripped the mast and meter off the wall. we have rebuilt and passed the temp power/partial final so the owner has power back on. just need a permit to get it closed out. cheers grant · 66 m away
- 905 Josephine StJun 15, 2026Replacement of complete existing central heat and air system with or without duct work · 71 m away
- 1402 Juliet StSep 3, 2026Installing dedicated gas supply to pull heater · 83 m away
- 900 S Lamar BlvdMay 28, 2026Replace 20 feet of cast iron under covered parking in rear of building for unit 205 only · 85 m away
- 907 Josephine StJul 17, 2025Replacement of complete existing central heat and air system with or without duct work · 85 m away