806 W Live Oak St
Austin, TX 78704
806 W Live Oak St: 1 project on record
City of Austin lists 1 filing across 1 project at 806 W Live Oak St, Austin, TX 78704. The most recent, filed March 28, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work on unit a front”.
Compiled from City of Austin records · updated Mar 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 28, 2024
- since Mar 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work on unit a front
- AppliedMar 25, 2024
- IssuedMar 28, 2024
- WorkMar '24 – Apr '24
- Final inspectionApr 1, 2024
Passed final inspection Apr 1, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work on unit a front
Replacement of complete existing central heat and air system with or without duct work on unit a front
City of Austin permitMechanical PermitFinal- Record
- 2024-036832 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 806 W Live Oak St
What is being built at 806 W Live Oak St?
The latest filing (City of Austin permit 2024-036832 MP, March 28, 2024) covers replacement of complete existing central heat and air system with or without duct work on unit a front.
How many permits and filings does 806 W Live Oak St have?
1 filing across 1 project, from March 28, 2024 to March 28, 2024.
What is being built near Ac 811 W Live Oak in Austin?
806 W Live Oak St is about 136 m from Ac 811 W Live Oak (811 W Live Oak). Its latest filing is for replacement of complete existing central heat and air system with or without duct work on unit a front.
Is there other construction near 806 W Live Oak St?
Yes. Nearby filings include 810 W Live Oak St (the permit is to install an ev charger. our mutual customer stated that they are in a historical district but believe they are grandfathered in to some type of code that will allow them to install the charger on a 12 x 12 concrete base in the easement. please advise, Feb 24, 2025); 2207 S 3rd St (installation of a hardwired level 2 charger with 50 amp breaker and #6 wire, Jan 10, 2024); 2209 S 3rd St (express; metal roof replacement, Jun 23, 2026).
How do I get alerts for new permits at 806 W Live Oak St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 810 W Live Oak StFeb 24, 2025The permit is to install an ev charger. our mutual customer stated that they are in a historical district but believe they are grandfathered in to some type of code that will allow them to install the charger on a 12 x 12 concrete base in the easement. please advise · 5 m away
- 2207 S 3rd StJan 10, 2024Installation of a hardwired level 2 charger with 50 amp breaker and #6 wire · 29 m away
- 2209 S 3rd StJun 23, 2026Express; metal roof replacement · 30 m away
- 2213 S 3rd StAug 19, 2026Total demolition of sfr 2185 sq ft circa 1941 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 35 m away
- 2204 S 3rd StOct 22, 2026New inground spa with reqd enclosure device. revision 1: decreased length of pool by 2 moved/detached spa and enlarged it. added more 3 sheer descent · 50 m away
- 2206 S 3rd StDec 26, 2023Irrigation system · 69 m away
- 2208 S 3rd StOct 8, 2026Irrigation install for landscape areas only · 89 m away
- 801 W Johanna StDec 19, 2025Construct new driveway approach of 18 ft and curb/gutter of 55ft. no sidewalk inspection per plan review · 119 m away
- 805 W Johanna StFeb 2, 2024Install a gas line for a generator · 119 m away
- 809 W Live Oak StJul 28, 2026Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 2011 S 3rd StFeb 15, 2026Gas test · 129 m away
- 2009 S 3rd StFeb 19, 2024New pool and spa for building 1 · 131 m away