900 Barton Springs Road
Austin, TX 78704 · City Of Austin - Austin Convention Center Department
Palmer Events Center adds two concessions areas
An interior remodel at the Palmer Events Center converts two back-of-house areas into concessions areas for retail sales from the kitchen. The project was registered with TDLR on December 10, 2024, and its inspection status is complete. The applicant estimated the project cost at $700,000.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2024
- since Dec 10, 2024
- Largest scope
- 1,864 sf
- Estimated cost
- $700K
- state registration
Where this project stands
Inspected · closing outPalmer Events Center - Food Production Remodel
1,864 sq ft · $700K est.
- RegisteredDec 10, 2024
- Plan review
- ConstructionFeb '25 – May '25
- Inspected
- Closednow
The building is substantially done. Move-in, fit-out and service work usually follow.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectThis project includes an interior remodel that converts two existing back-of-house areas into two new concessions areas to provide retail sales from the kitchen. — palmer events center
TDLR project registrationRenovation/AlterationInspection Complete1,864 sq ft$700K est.- Project #
- TABS2025007285
- Tenant / owner
- Palmer Events Center - Food Production Remodel
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 900 Barton Springs Road
What is being built at 900 Barton Springs Road?
The Palmer Events Center is remodeling two existing back-of-house areas into concessions areas for retail sales from the kitchen.
What’s going in near 901 Barton Springs Road?
The Palmer Events Center project at 900 Barton Springs Road converts two back-of-house areas into concessions areas. TDLR registered it on December 10, 2024.
Is a new restaurant opening at the Palmer Events Center?
The project description identifies two new concessions areas for retail sales from the kitchen. It does not identify a new restaurant.
When was the Palmer Events Center food production remodel permitted?
The TDLR project registration, TABS2025007285, is dated December 10, 2024.
How large is the Palmer Events Center remodel?
The registered project covers 1,864 square feet and is described as an interior renovation.
How much will the Palmer Events Center remodel cost?
The applicant estimated the project cost at $700,000. This is an estimate for the project, not a reported final cost.
Is the Palmer Events Center concessions project complete?
The TDLR registration lists the project status as Inspection Complete.
Also being built nearby
All of 78704- 901 Barton Springs Road · 901 903 Barton Springs LLCApr 1, 2026Submersive — renovation/alteration — renovation of an existing one-story commercial building + first floor of existing three-story building. new building use to be personal improvement services for an immersive art space + bath house · 13 m away
- 901 Barton Springs RdNov 16, 2026Interior non-structural demolition · 48 m away
- 900 Barton Springs RdSep 10, 2026Replacement of two existing boilers within the palmer events center · 71 m away
- 512 Bouldin AveOct 23, 2026Unit a - replacement of complete existing central heat and air system with or without duct work install new 2.5-ton carrier comfort series 15.2-seer2 single-speed electric ac & gas heating system · 79 m away
- 811 Barton Springs RdNov 16, 2026Subdivide open area into 4 offices with a corridor an av training room and the rest of the space will remain an open area. 2026-138526 da · 81 m away
- 3995 Fm150 E, 3995 Ranch To Market Rd 150 811 Barton Springs Road · Hemphill EsJan 29, 2024Hemphill improvements — renovation/alteration — cooler/freezer replacement · 114 m away
- 801 Farm To Market 1626 811 Barton Springs Road · Elm Grove EsJan 29, 2024Elm grove es improvements — renovation/alteration — cooler/freezer replacement · 114 m away
- 1005 E, Ranch To Market Rd 150 811 Barton Springs Road · Tobias EsJan 29, 2024Tobias es improvements — renovation/alteration — maintenance asphalt, hvac unit, cooler/freezer replacement and roof replacement, fire alarm · 114 m away
- 4125 Ranch To Market Rd 967 811 Barton Springs Road · Impact CenterJan 29, 2024Impact center improvements — renovation/alteration — site improvements, hvac unit replacement, interior renovations · 114 m away
- 811 Barton Springs Road · Cpf 811 Barton LLCOct 19, 2026Pluckers office remodel — renovation/alteration — remodeling and refinishing an existing space within the occupied office. new partition walls and doors to create enclosed offices and corridor · 114 m away
- 811 Barton Springs Road · Cpf 811 Barton LLC C/O TranswesternFeb 8, 2024Floor 2 restroom renovation — renovation/alteration — renovation of existing bathrooms within current walls · 114 m away
- 3600 FM 967 811 Barton Springs Road · Dahlstrom MsJan 29, 2024Dahlstrom improvements — renovation/alteration — maintenance asphalt replacement, hvac unit replacement · 114 m away