901 Congress Ave
Austin, TX 78704
South Congress office and mixed-use plans are inactive
Austin records list three site-plan cases for office or mixed-use proposals at 901 Congress Ave. The latest, dated Aug. 29, 2026, is marked inactive; an office case dated Apr. 15, 2026, was withdrawn, and a mixed-use case dated Jan. 31, 2025, expired. The records provided show no active case or construction permit.
Summarized from City of Austin records · updated Aug 29, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 29, 2026
- since Jan 31, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Austin
Questions about 901 Congress Ave
What is being built at 901 Congress Ave in Austin?
City records list site-plan cases for South Congress office and mixed-use proposals, but all three cases are inactive, withdrawn, or expired. The records provided do not show an active case or construction permit.
Is construction happening at 901 Congress Ave?
The records provided do not confirm construction. The latest site-plan case, dated Aug. 29, 2026, is marked inactive.
What is the status of the South Congress office plan at 901 Congress Ave?
The Austin case dated Apr. 15, 2026, is named South Congress Office and is marked withdrawn. Its case number is 12802797.
What happened to the mixed-use plan at 901 Congress Ave?
The Jan. 31, 2025, South Congress Mixed Use case, number 13215898, is marked expired. A later mixed-use case, number 13662798, is dated Aug. 29, 2026, and marked inactive.
What's planned at 901 Congress Ave near The Friedkin Group?
901 Congress Ave has site-plan filings for office and mixed-use proposals. The Friedkin Group is listed nearby at 1009 S. Congress Avenue, but the records do not identify it as part of the 901 Congress proposals.
Is a new office opening at 901 Congress Ave in Austin?
The records show an office site-plan case dated Apr. 15, 2026, but it was withdrawn. They do not confirm an office opening.
Also being built nearby
All of 78704- 907 Congress AveAug 22, 2023907 s congress ave · 33 m away
- 611 S Congress AveOct 16, 2026Demolition roof mechanical existing condensing unit and associated refrigerant piping. prepare roof penetrations for new piping. install new curbed outside air intake and install condensing unit. install new exhaust fan · 51 m away
- 1007 South Congress Street · Music Lane 1007 Owners, LLCMar 12, 2024Birkenstock — renovation/alteration — retail tenant interior fit-out · 55 m away
- 1007 S. Congress Ve · Music Lane 1007 Owner, LPSep 19, 2024Vuori austin tx — renovation/alteration — 3,454 sq ft tenant improvement of an existing retail space, exterior street location. scope of work includes demolition and construction of interior non-load bearing partitions, doors, lighting, electrical, plumbing, mechanical, sprinkler, fire alarm · 55 m away
- 1009 S. Congress Avenue · Music Lane Owner, LLCSep 24, 2026The friedkin group — renovation/alteration — build five new offices within the existing floor footprint, new flooring and paint. 7,000 sq ft · 57 m away
- 1011 South Congress · Music Lane Owner LLCJan 31, 2026Todd snyder # 5532 — renovation/alteration — interior alteration to existing space to include demolition, mech, elect & plumb work. square footage of improvements is 1,902 sq ft · 60 m away
- 1007 S Congress AveAug 31, 2026Interior non structural demolition · 90 m away
- 1007 Congress AveOct 31, 2025Neighborhood goods · 98 m away
- 1102 Congress AveMar 2, 2007Texas school for the deaf new retaining wall at congress avenue · 126 m away
- 515 S Congress AveAug 22, 2025Replace rpz at lobby soda machine (freebirds) · 132 m away
- 611 S Congress · Maemura CompanyAug 6, 20255th floor common area remodel — renovation/alteration — interior remodel of existing restrooms and elevator lobby · 133 m away
- 611 S Congress · Maemura CompanyJun 16, 20251st floor common area remodel — renovation/alteration — interior remodel of existing restrooms and updated finishes for corridor · 133 m away
More offices in 78704.