921 St Edwards Dr
Austin, TX 78704
921 St Edwards Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 921 St Edwards Dr, Austin, TX 78704. The most recent, filed March 2, 2007, covers: “Brothers of the holy cross”.
Compiled from City of Austin records · updated Mar 2, 2007
- Projects
- 2
- 2 filings
- Latest filing
- Mar 2, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 921 St Edwards Dr
What is being built at 921 St Edwards Dr?
The latest filing (City of Austin case 155066, March 2, 2007) covers brothers of the holy cross.
How many permits and filings does 921 St Edwards Dr have?
2 filings across 2 projects, from March 2, 2007 to March 2, 2007.
Is there other construction near 921 St Edwards Dr?
Yes. Nearby filings include 2711 Little John Ln (repair of subfloor sanitary sewer system via tunnel excavation, Aug 12, 2026); 2707 Little John Ln (install new 6.9 kw dc rooftop solar system to existing residential, Dec 17, 2025); 2705 Little John Ln (rebuild existing service to 200a, Nov 13, 2025).
How do I get alerts for new permits at 921 St Edwards Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78704- 2711 Little John LnAug 12, 2026Repair of subfloor sanitary sewer system via tunnel excavation · 169 m away
- 2707 Little John LnDec 17, 2025Install new 6.9 kw dc rooftop solar system to existing residential · 190 m away
- 2705 Little John LnNov 13, 2025Rebuild existing service to 200a · 201 m away
- 2711 St Edwards CirSep 16, 2024Replacement of an existing water heater · 243 m away
- 2702 Little John LnNov 13, 2025Upgrading electrical service · 244 m away
- 1306 St Edwards DrApr 22, 2025Tunnel under foundation from the outside to replace cast iron for the entire duplex under the foundation that includes 2 full bathrooms 2 kitchen drain lines and 2 washer drain lines. there will be a total of 4 access holes to tunnel under foundation and total length of tunnel is 95 feet. we will also replace sewer line from the home to the city tap that is approximately 60 feet long · 255 m away
- 2707 East Side DrAug 26, 2026Cap off water/waste water · 256 m away
- 2614 Little John LnOct 30, 2026Upgrade service from 100 amp to 200 amp overhead. remove old ser riser and replace with a conduit and weather-head · 267 m away
- 2612 Little John LnJan 23, 2026Replacement of an existing water heater change out: install/ replace 40 gallon natural gas water heaters · 279 m away
- 2708 East Side DrJul 14, 2025Disconnect/reconnect for electrical rebuild for new solar and battery installation at existing residence · 290 m away
- 1401 St Edwards DrJul 8, 2025Emergency: fire occured in one apartment at building i. we need to restore gas to the building. we have tested the gas piping and it is holding pressure · 296 m away
- 2704 East Side DrFeb 3, 2026Replacement of an existing water heater replace 40-gallon gas water heater located in back closet of house · 306 m away