102 W 33rd St
Austin, TX 78705
Electrical and sewer line repairs at 102 W 33rd St
City of Austin permits at 102 W 33rd St cover repairs, not a new building project. A plumbing permit filed January 18, 2024, covers replacement of up to 70 feet of the main sewer yard line; an electrical permit filed September 17, 2026, covers temporarily disconnecting and reconnecting power to replace a damaged weather head.
Summarized from City of Austin records · updated Sep 17, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 17, 2026
- since Jan 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTemp disconnect needed to replace damaged weather head & then reconnect
- AppliedSep 14, 2026
- IssuedSep 17, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 25, 2026
Passed final inspection Sep 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsTemp disconnect needed to replace damaged weather head & then reconnect
Temp disconnect needed to replace damaged weather head & then reconnect
City of Austin permitElectrical PermitFinal- Record
- 2026-120598 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacing up to 70 feet of main sewer yard line
Replacing up to 70 feet of main sewer yard line
City of Austin permitPlumbing PermitFinal- Record
- 2024-005171 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 102 W 33rd St
What is being built at 102 W 33rd St in Austin?
The records do not describe a new building. They show sewer line work and an electrical repair.
What work was permitted at 102 W 33rd St?
A plumbing permit covers replacing up to 70 feet of the main sewer yard line. An electrical permit covers a temporary power disconnect and reconnection to replace a damaged weather head.
When was the electrical work at 102 W 33rd St permitted?
The City of Austin electrical permit, 2026-120598 EP, was filed September 17, 2026, and is marked final.
When was the sewer line work at 102 W 33rd St permitted?
The City of Austin plumbing permit, 2024-005171 PP, was filed January 18, 2024, and is marked final.
Is a new building planned at 102 W 33rd St?
The records provided show two repair permits: one for a sewer yard line and one for a damaged weather head. They do not describe a new building.
How many permits are listed for 102 W 33rd St?
The City of Austin records list two permits: a plumbing permit filed in 2024 and an electrical permit filed in 2026. Both are marked final.
Also being built nearby
All of 78705- 100 W 33rd StAug 5, 2026Repairing riser and replacing meter can due to damage at ae pole caused by a road accident · 20 m away
- 108 W 33rd StNov 4, 2026New garage second story addition and interior remodel to existing accessory structure to rear of sfr. existing driveway on 34th to be widened · 48 m away
- 103 W 33rd StSep 9, 2024Replace sewer yard line with sch 40 pvc piping · 55 m away
- 3305 SpeedwayJun 10, 2026Interior remodel - retroactively permitting work that was previously completed addressing items in a issued code violation. work will include work listed in expired permit 2024-092619 mp · 62 m away
- 3301 SpeedwayAug 17, 2026Replace the existing rotten deck at the existing apartment complex-unit 203 · 79 m away
- 3405 Cedar StDec 6, 2023Express: exploratory non-structural demolition and foundation repair · 98 m away
- 3406 SpeedwayApr 23, 2024Unit #4: pulled meter by gas company fix gas leak · 107 m away
- 114 W 33rd StJun 16, 2025Irrigation and plants · 107 m away
- 3307 Helms StSep 10, 2026Dig from water meter replacing main water service. replace all hot/cold pipes replace drain to existing res. pier and beam · 121 m away
- 200 W 33rd StAug 25, 2025Remodel main house kitchen addition of mudroom/utility room to main house kitchen. new accessory structure to the backyard at 34th street with bathroom storage shed and 12x15 pool with integrated 12x6 spa and 1 coping · 126 m away
- 113 W 33rd StJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 112 W 32nd StJul 24, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton horizontal gas two stage system (upstairs) · 131 m away