203 W 32nd St
Austin, TX 78705
Garage conversion to home office and Level 2 EV charger
Permits at 203 W 32nd St cover converting the garage into a home office, including replacing the garage door with windows and adding air-conditioning. The building permit was filed on September 19, 2024; a separate permit for a Level 2 EV charger was filed on September 24, 2025.
Summarized from City of Austin records · updated Sep 24, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Sep 24, 2025
- since Sep 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedSep 19, 2025
- IssuedSep 24, 2025
- WorkSep '25 – Mar '26
- Final inspectionOct 3, 2025
Passed final inspection Oct 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-119680 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Garage conversion - replace garage door with windows (in keeping with style of house) and air-condition to make it into a home office
Garage conversion - replace garage door with windows (in keeping with style of house) and air-condition to make it into a home office
City of Austin permitElectrical PermitFinal- Record
- 2024-126140 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Garage conversion - replace garage door with windows (in keeping with style of house) and air-condition to make it into a home office
Garage conversion - replace garage door with windows (in keeping with style of house) and air-condition to make it into a home office
City of Austin permitMechanical PermitFinal- Record
- 2024-126140 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Garage conversion - replace garage door with windows (in keeping with style of house) and air-condition to make it into a home office
Garage conversion - replace garage door with windows (in keeping with style of house) and air-condition to make it into a home office
City of Austin permitBuilding PermitFinal- Record
- 2024-126140 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 203 W 32nd St
What is being built at 203 W 32nd St in Austin?
Austin permits describe a garage conversion into a home office, with windows replacing the garage door and air-conditioning added. A separate permit covers installing a Level 2 EV charger.
Is 203 W 32nd St being converted into an office?
The permit description says the garage is being converted into a home office. The building permit, 2024-126140 BP, was filed September 19, 2024.
When was the garage conversion at 203 W 32nd St permitted?
The building permit for the garage conversion was filed September 19, 2024. Mechanical and electrical permits for the same work followed on October 3 and October 5, 2024.
Is an EV charger being installed at 203 W 32nd St?
Yes. City of Austin permit 2025-119680 EP, filed September 24, 2025, covers installation of a Level 2 EV charger.
What permits were filed for 203 W 32nd St?
Records include building permit 2024-126140 BP, mechanical permit 2024-126140 MP, and electrical permit 2024-126140 EP for the home-office garage conversion. Electrical permit 2025-119680 EP covers the Level 2 EV charger.
Also being built nearby
All of 78705- 201 W 32nd StMay 21, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout- like for like. replace current system with new 2.5 ton single stage goodman system · 2 m away
- 203 W 33rd StApr 3, 2024Demolishing an unpermitted attached pergola and constructing a new covered porch (addition) · 89 m away
- 113 W 33rd StJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 3121 Hemphill ParkJan 23, 2026Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 117 Laurel LnMar 27, 2024Replacement of complete existing central heat and air system with or without duct work · 107 m away
- 106 Laurel LnJun 13, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton vertical gas · 114 m away
- 109 Laurel LnSep 3, 2025Replacement of complete existing central heat and air system with or without duct work · 140 m away
- 204 W 33rd StJun 11, 2025Repaired service due to storm damaged replaced meter base and panel and wire and riser like for like ***storm related-hyatt · 144 m away
- 200 W 33rd StAug 25, 2025Remodel main house kitchen addition of mudroom/utility room to main house kitchen. new accessory structure to the backyard at 34th street with bathroom storage shed and 12x15 pool with integrated 12x6 spa and 1 coping · 147 m away
- 107 Laurel LnJul 9, 2025Replacing service mast and meter enclosure damaged by recent storms · 151 m away
- 114 W 33rd StJun 16, 2025Irrigation and plants · 152 m away
- 113 W 32nd StAug 21, 2026Replacement of complete existing central heat and air system with or without duct work hvac changeout/alteration: replacing like for like 2t vert gas · 153 m away
More offices in 78705.