2404 Guadalupe St
Austin, TX 78705
Gas meter relocation and HVAC work at 2404 Guadalupe
City of Austin permits indicate gas meter relocation work at 2404 Guadalupe St, filed December 3, 2025. An earlier permit, filed August 20, 2024, covered replacement of two rooftop units and one split system.
Summarized from City of Austin records · updated Dec 3, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Dec 3, 2025
- since Aug 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRelocate the curb / side walk gas meter to the rear of building. per tx gas relocation project
- AppliedNov 18, 2025
- IssuedDec 3, 2025
- WorkDec '25 – Dec '25
- Final inspectionDec 23, 2025
Passed final inspection Dec 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsRelocate the curb / side walk gas meter to the rear of building. per tx gas relocation project
Relocate the curb / side walk gas meter to the rear of building. per tx gas relocation project
City of Austin permitPlumbing PermitFinal- Record
- 2025-147949 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Changing out two roof top units. change out one split system
Changing out two roof top units. change out one split system
City of Austin permitMechanical PermitFinal- Record
- 2024-103447 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace 1/2 rpz backflow device located behind the ice machine for the ice machine
Replace 1/2 rpz backflow device located behind the ice machine for the ice machine
City of Austin permitPlumbing PermitFinal- Record
- 2023-120242 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2404 Guadalupe St
What is being built at 2404 Guadalupe St?
The listed permits cover utility and mechanical work, not a new building: relocating a gas meter and replacing HVAC equipment.
When was work permitted at 2404 Guadalupe?
The gas meter relocation permit, 2025-147949 PP, was filed December 3, 2025. The HVAC permit, 2024-103447 MP, was filed August 20, 2024.
What does the gas meter permit at 2404 Guadalupe cover?
Permit 2025-147949 PP describes relocating the curbside gas meter to the rear of the building, per a Texas Gas relocation project. It was filed December 3, 2025.
What HVAC work is planned at 2404 Guadalupe?
Permit 2024-103447 MP covers replacing two rooftop units and one split system. It was filed August 20, 2024.
What work is planned near the Castilian at 2404 Guadalupe?
The permits at 2404 Guadalupe list a gas meter relocation and HVAC equipment replacement. The Castilian is listed about 105 meters away.
Also being built nearby
All of 78705- 2414 Guadalupe St · 2420 Guadalupe Series, A Series Of Fcde, LLCDec 3, 2025Relocate the curb / side walk gas meter to the back of the building. per tx gas relocation project · 14 m away
- 2406 Guadalupe StJan 23, 2025Replacement of complete existing central heat and air system with or without duct work urban outfitters 00021 removal and replacement of 3 rtu. *new units* kgc120s4ms ge/10t kgc092s4ms ge/7.5t kgc092s4ms ge/7.5t · 15 m away
- 2416 Guadalupe StJul 16, 2025Lil ramen tatsuya - lit teeth wall sign · 23 m away
- 415 W 24th Street · Campus Investors Austin, LPJan 29, 2025Limegreen - ut — renovation/alteration — fully sprinklered restaurant renovation · 40 m away
- 2420 Guadalupe StFeb 9, 20242024/03/14 -#sfs24 two days of daytime live music at space 2420 the outdoor patio space connected to urban outfitters on guadalupe · 44 m away
- 2354 Guadalupe StJan 17, 2024Re-roof · 50 m away
- 2417 San Antonio StMay 8, 2015Space 2420 · 55 m away
- 2426 Guadalupe StApr 29, 2026Replace rpz for ice machine in the kitchen for cava · 59 m away
- 2350 Guadalupe StJul 2, 2026Interior finish out of an existing retail space into a retail card & collectibles shop non-structural demolition / interior remodel / no new hvac square footage / no change of use (retail to retail) · 64 m away
- 415 W 24th StJul 17, 2025Secondary mechanical contractor for 2025-031096 bp. will be performing installation for walk in cooler only · 65 m away
- 2338 Guadalupe StOct 9, 2024Interior remodel to existing retail store · 87 m away
- 504 W. 24th St · Lincoln VenturesApr 12, 2024Starbucks - w. 24th & nueces — renovation/alteration — major renovation of an existing starbucks. work to include interior partitions, interior finishes, equipment, lighting/ ceiling, hvac and furniture · 87 m away