2501 Pearl St
Austin, TX 78705
Central heating and air system replacements at 2501 Pearl St
City of Austin permits indicate replacement of existing central heating and air systems at 2501 Pearl St. The latest permit was filed September 9, 2026, and is marked final.
Summarized from City of Austin records · updated Sep 9, 2026
- Projects
- 8
- 8 filings
- Latest filing
- Sep 9, 2026
- since Nov 2, 2007
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled***timed virtual inspection: 10/20/2026 @ 11 am*** replacement of complete existing central heat and air system with or without duct work
- AppliedAug 31, 2026
- IssuedSep 9, 2026
- WorkSep '26 – Oct '26
- Final inspectionOct 20, 2026
Passed final inspection Oct 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
8 projects***timed virtual inspection: 10/20/2026 @ 11 am*** replacement of complete existing central heat and air system with or without duct work
***timed virtual inspection: 10/20/2026 @ 11 am*** replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-113952 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2026-084185 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of condenser only replacement of 1.5 ton condenser with a new 1.5 condenser without duct work for unit 408
Replacement of condenser only replacement of 1.5 ton condenser with a new 1.5 condenser without duct work for unit 408
City of Austin permitMechanical PermitExpired- Record
- 2025-103168 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-149616 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-149608 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-143911 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Re-roof existing commercial building
Re-roof existing commercial building
City of Austin permitBuilding PermitFinal- Record
- 2022-164527 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2501 Pearl St
What is being built at 2501 Pearl St in Austin?
Recent City of Austin permits indicate replacement of existing central heating and air systems, rather than a new building project. The latest permit, 2026-113952 MP, was filed September 9, 2026, and is marked final.
Is a new building planned at 2501 Pearl St?
The recent records listed for this address are mechanical permits for heating and air system replacements. A site plan case called “Block at 25th West (Smart Housing)” was approved and released in 2007.
When was the latest permit filed for 2501 Pearl St?
The latest listed permit was filed September 9, 2026. Permit 2026-113952 MP covers replacement of the existing central heating and air system and is marked final.
What work does permit 2026-113952 MP cover?
The permit description says the work is replacement of the complete existing central heat and air system, with or without duct work. It was filed September 9, 2026, and is marked final.
What permits have been filed at 2501 Pearl St?
The City of Austin lists seven records at the address, including mechanical permits filed from 2024 to 2026 and a site plan case approved and released in 2007. Several recent permits cover replacement of existing central heating and air systems.
What work is happening near Kappa Alpha Theta Kitchen Renovation on Pearl Street?
At 2501 Pearl St, about 122 meters away, City of Austin permits indicate replacement of existing central heating and air systems. The latest listed permit was filed September 9, 2026.
What work is happening near Bell's Beach in Austin?
At 2501 Pearl St, about 160 meters from Bell's Beach, recent permits indicate replacement of existing central heating and air systems. The latest listed permit, 2026-113952 MP, was filed September 9, 2026.
Also being built nearby
All of 78705- 807 W 25th StAug 5, 2025Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 2506 Pearl StFeb 17, 20262026/03/07 | an annual event with a performing artist. #greek · 83 m away
- 2414 Pearl StNov 9, 20262026/11/20 | private event for members and invited guests. party and two tailgates · 89 m away
- 806 W 24th StJul 20, 2025Replacement of complete existing central heat and air system with or without duct work code to get in 172436 apt#331 changing out 1.5ton furdown airhandler · 101 m away
- 707 Graham PlJul 2, 2024Provide service upgrade for duplex (707 & 707.5) so that federal pacific panels can be removed. as part of service upgrade panels will need to be moved around the corner and circuits re-feed from new panels that are at new location · 106 m away
- 910 W 25th StAug 5, 2026Fire damage remediation and rebuild on 3 floors multiple units 210 505 506 605 606. project will require mechanical and electrical roof repaid with structural letter stucco repair and sheetrock repair. mold remediation letter will be required · 109 m away
- 2515 Pearl StNov 8, 2007The texan at pearl; smart housing · 118 m away
- 2401 Pearl St · Kappa Alpha Theta Fraternity Housing CorporationApr 28, 2026Interior renovation to the existing kitchen serving the residential facility along with the replacement of the grease interceptor. scope includes abatement of hazardous materials new floor wall and ceiling finishes. limited modification of the existing hvac ductwork ou replacement of an interior electrical panel. the exterior scope encompasses relocation of the existing exterior walk-in cooler to the kitchen interior see attached for full scope · 122 m away
- 2505 San Gabriel StJul 27, 2025Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 2500 Rio Grande StMay 20, 2016Alpha epsilon phi · 129 m away
- 2514 Pearl StApr 11, 2024Replace 2 windows with same size windows in living room. replace 2 windows with same size windows in bedroom suite a & d (2) applications · 135 m away
- 711 W 26th StJul 15, 2026Replacement of an existing water heater changing out the water heater for a similar model · 143 m away