3007 N Lamar Blvd
Austin, TX 78705
Sewer and drain line repairs permitted at 3007 N Lamar
A permit filed August 4, 2025, covers excavation to repair the main drain line and sewer main line at 3007 N Lamar Blvd. The City of Austin permit, 2025-090768 PP, is marked final.
Summarized from City of Austin records · updated Aug 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2025
- since Aug 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 30 tunnel to repair main drain line and excavate 40 trench with cutting concrete to repair sewer main line
- AppliedJul 21, 2025
- IssuedAug 4, 2025
- WorkAug '25 – Sep '25
- Final inspectionSep 11, 2025
Passed final inspection Sep 11, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 30 tunnel to repair main drain line and excavate 40 trench with cutting concrete to repair sewer main line
Excavate 30 tunnel to repair main drain line and excavate 40 trench with cutting concrete to repair sewer main line
City of Austin permitPlumbing PermitFinal- Record
- 2025-090768 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3007 N Lamar Blvd
What is happening at 3007 N Lamar Blvd?
A City of Austin plumbing permit covers excavation to repair the main drain line and sewer main line. It was filed August 4, 2025, and is marked final.
Is a new building being built at 3007 N Lamar?
The permit describes sewer and drain line repairs, not construction of a new building.
What does permit 2025-090768 PP cover?
It covers excavating a 30-foot tunnel to repair the main drain line and a 40-foot trench, including cutting concrete, to repair the sewer main line.
When was the plumbing permit filed for 3007 N Lamar?
The City of Austin permit was filed August 4, 2025. Its status is final.
What work is happening near Kick Pleat on North Lamar?
A plumbing permit at 3007 N Lamar Blvd, about 45 meters from Kick Pleat at 3027 N Lamar Blvd, covers excavation to repair the main drain and sewer main lines.
Also being built nearby
All of 78705- 3009 N Lamar BlvdFeb 27, 2026Replacement of complete existing central heat and air system with or without duct work replacement of split electric system · 18 m away
- 3027 N Lamar Blvd · 3027 N. Lamar Blvd.Jul 20, 2026Remodel of existing building to retail space with change of use · 45 m away
- 3027 Lamar BlvdMar 2, 20073027 n. lamar & 3125 n lamar · 50 m away
- 903 W 31st StNov 18, 2025Express - replace 8 windows like for like · 79 m away
- 904 W 30th StMay 1, 2025200amp panel and 200 amp meter overhead service with grounding · 84 m away
- 3100 N Lamar BlvdApr 30, 2026Replace old meter with new one · 117 m away
- 2915 San Gabriel St · Mcbride's Gun ShopSep 24, 2026Fireline installation · 126 m away
- 1100 Belmont PkwyFeb 16, 2024Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 810 W 31st StFeb 16, 2024*request to disconnect* upgrade existing 200a meter to 320a. add additional 200a panel with main disconnect · 140 m away
- 3104 Grandview StAug 21, 2008Oakwood resub of a part of olt 72 & 75 div d; amended plat of lts 73 & 74 · 142 m away
- 1014 W 31st StAug 13, 2024Replacement of complete existing central heat and air system with or without duct work · 144 m away
- 806 W 31st StAug 19, 2026Express- repair on existing foundation · 166 m away