301 E 38th St
Austin, TX 78705
301 E 38th St: 1 project on record
City of Austin lists 1 filing across 1 project at 301 E 38th St, Austin, TX 78705. The most recent, filed June 3, 2025, covers: “Relocation of 6 ww service”.
Compiled from City of Austin records · updated Jun 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 3, 2025
- since Jun 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectRelocation of 6 ww service
Relocation of 6 ww service
City of Austin permitPlumbing PermitFinal- Record
- 2025-066634 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 301 E 38th St
What is being built at 301 E 38th St?
The latest filing (City of Austin permit 2025-066634 PP, June 3, 2025) covers relocation of 6 ww service.
How many permits and filings does 301 E 38th St have?
1 filing across 1 project, from June 3, 2025 to June 3, 2025.
Is there other construction near 301 E 38th St?
Yes. Nearby filings include 305 E 38th St (replacement of an existing water heater water heater replacement, Jan 16, 2025); 3706 Grooms St (relocating the existing sewer yard line to connect to the new cip service tap at the front of the house, Feb 12, 2026); 3800 Avenue G (replacement of an existing water heater, Sep 15, 2026).
How do I get alerts for new permits at 301 E 38th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 305 E 38th StJan 16, 2025Replacement of an existing water heater water heater replacement · 34 m away
- 3706 Grooms StFeb 12, 2026Relocating the existing sewer yard line to connect to the new cip service tap at the front of the house · 42 m away
- 3800 Avenue GSep 15, 2026Replacement of an existing water heater · 44 m away
- 3705 Grooms StJun 3, 2025Relocate 6 ww service · 48 m away
- 3704 Grooms StSep 30, 2026Retroactively permitting accessory use detached uncovered wood deck · 50 m away
- 3701 Grooms StOct 13, 2025Extended electrical conduit and conductors to relocate a light fixture. work description: utilize existing light circuit with wall switch. extend circuit ~8 feet so chandelier can be centered in the building. install 12 awg thhn copper conductors (hot neutral ground). run conductors in 3/4 metal conduit with metallic fittings for fire protection. provide and install listed ceiling box/support rated for 50 lbs (fixture is ~10 lbs). mount chandelier per manufacturers instructions. bond all metal components to equipment grounding conductor. test for continuity grounding and correct polarity. update panel schedule to reflect new fixture location · 58 m away
- 3608 Grooms StJun 3, 2025Relocation of 6 wastewater service · 60 m away
- 3802 Avenue GJul 29, 2025Tunneling under foundation to make repair to drain line · 70 m away
- 3803 Avenue FAug 5, 2025This is for relocating the service to the back of the property closer to the service pole. this will be a 200amp member pole service. we will go underground to main house · 77 m away
- 311 E 38th StMar 6, 2026Relocating the existing sewer yard line to connect to the new cip service tap at the front of the house · 79 m away
- 3504 Grooms StSep 30, 2025Express - foundation repair · 86 m away
- 3805 Avenue FJan 2, 2025Replacement of complete existing central heat and air system with or without duct work 4 ton vertical system · 90 m away