305 E 38th St
Austin, TX 78705
305 E 38th St: 1 project on record
City of Austin lists 1 filing across 1 project at 305 E 38th St, Austin, TX 78705. The most recent, filed January 16, 2025, covers: “Replacement of an existing water heater water heater replacement”.
Compiled from City of Austin records · updated Jan 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jan 16, 2025
- since Jan 16, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of an existing water heater water heater replacement
Replacement of an existing water heater water heater replacement
City of Austin permitPlumbing PermitExpired- Record
- 2025-001291 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 305 E 38th St
What is being built at 305 E 38th St?
The latest filing (City of Austin permit 2025-001291 PP, January 16, 2025) covers replacement of an existing water heater water heater replacement.
How many permits and filings does 305 E 38th St have?
1 filing across 1 project, from January 16, 2025 to January 16, 2025.
Is there other construction near 305 E 38th St?
Yes. Nearby filings include 301 E 38th St (relocation of 6 ww service, Jun 3, 2025); 3800 Avenue G (replacement of an existing water heater, Sep 15, 2026); 311 E 38th St (relocating the existing sewer yard line to connect to the new cip service tap at the front of the house, Mar 6, 2026).
How do I get alerts for new permits at 305 E 38th St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 301 E 38th StJun 3, 2025Relocation of 6 ww service · 34 m away
- 3800 Avenue GSep 15, 2026Replacement of an existing water heater · 45 m away
- 311 E 38th StMar 6, 2026Relocating the existing sewer yard line to connect to the new cip service tap at the front of the house · 46 m away
- 3705 Grooms StJun 3, 2025Relocate 6 ww service · 57 m away
- 3802 Avenue GJul 29, 2025Tunneling under foundation to make repair to drain line · 66 m away
- 3710 Tom Green StDec 17, 2025Install wastewater yard line · 71 m away
- 3701 Grooms StOct 13, 2025Extended electrical conduit and conductors to relocate a light fixture. work description: utilize existing light circuit with wall switch. extend circuit ~8 feet so chandelier can be centered in the building. install 12 awg thhn copper conductors (hot neutral ground). run conductors in 3/4 metal conduit with metallic fittings for fire protection. provide and install listed ceiling box/support rated for 50 lbs (fixture is ~10 lbs). mount chandelier per manufacturers instructions. bond all metal components to equipment grounding conductor. test for continuity grounding and correct polarity. update panel schedule to reflect new fixture location · 71 m away
- 3706 Grooms StFeb 12, 2026Relocating the existing sewer yard line to connect to the new cip service tap at the front of the house · 76 m away
- 3704 Grooms StSep 30, 2026Retroactively permitting accessory use detached uncovered wood deck · 81 m away
- 3506 Tom Green StMar 2, 2007Smith-martin residence · 82 m away
- 3804 Avenue GJul 15, 2024Replacement of complete existing central heat and air system with or without duct work · 87 m away
- 3608 Grooms StJun 3, 2025Relocation of 6 wastewater service · 88 m away