3308 Hampton Rd
Austin, TX 78705 · Austin Independent School District
Austin school permits cover an office remodel and boiler replacement
Permit records for 3308 Hampton Rd describe a front office remodel and new storefront enclosure at an existing educational facility. The related electrical permit, 2024-062811 EP, was filed February 4, 2025, and is marked final; separate permits for a similar-capacity high-efficiency boiler replacement were filed October 28, 2024, and October 31, 2025, and are marked expired.
Summarized from City of Austin, Texas Department of Licensing and Regulation records · updated Oct 31, 2025
- Projects
- 8
- 8 filings
- Latest filing
- Oct 31, 2025
- since Mar 2, 2007
- Largest scope
- 897 sf
- Estimated cost
- $155K
- state registration
Permit & project history
8 projectsReplacement of existing boiler with new pre-ordered and pre-purchased similar capacity high efficiency boiler
Replacement of existing boiler with new pre-ordered and pre-purchased similar capacity high efficiency boiler
City of Austin permitMechanical PermitExpired- Record
- 2024-140834 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Front office remodel and new storefront enclosure of existing educational facility
Front office remodel and new storefront enclosure of existing educational facility
City of Austin permitElectrical PermitFinal- Record
- 2024-062811 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of existing boiler with new pre-ordered and pre-purchased similar capacity high efficiency boiler
Replacement of existing boiler with new pre-ordered and pre-purchased similar capacity high efficiency boiler
City of Austin permitBuilding PermitExpired- Record
- 2024-140834 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Front office remodel and new storefront enclosure of existing educational facility
Front office remodel and new storefront enclosure of existing educational facility
City of Austin permitBuilding PermitFinal- Record
- 2024-062811 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Front office remodel and new storefront enclosure. — russell lee elementary school
TDLR project registrationRenovation/AlterationProject Closed897 sq ft$155K est.- Project #
- TABS2024017369
- Tenant / owner
- Security Vestibule - Lee
- Design firm
- Pro
- Contact
- Pro
Sources: City of Austin · Texas Department of Licensing and Regulation
Questions about 3308 Hampton Rd
What is happening at 3308 Hampton Rd in Austin?
City of Austin permits describe a front office remodel and new storefront enclosure at an existing educational facility, along with permits for a boiler replacement. The office-related electrical permit, 2024-062811 EP, was filed February 4, 2025, and is marked final.
Is a new school being built at 3308 Hampton Rd?
The recent permits describe work at an existing educational facility, not a new school. Older site-plan records list Lee Elementary School additions and are marked approved and released.
What work was permitted at 3308 Hampton Rd in 2025?
The February 4, 2025, electrical permit describes a front office remodel and new storefront enclosure. A boiler replacement permit was filed October 31, 2025, and is marked expired.
Was the boiler replacement permit at 3308 Hampton Rd approved?
The city records list a building permit filed October 28, 2024, and a mechanical permit filed October 31, 2025, for replacement of the existing boiler with a similar-capacity high-efficiency boiler. Both are marked expired.
What is the status of the front office remodel permit at 3308 Hampton Rd?
Electrical permit 2024-062811 EP, filed February 4, 2025, is marked final. Its description includes a front office remodel and new storefront enclosure at an existing educational facility.
Also being built nearby
All of 78705- 3313 Hampton RdJul 23, 2025Kitchen remodel: replacing windows. installing new cabinets. new layout. installing 6 recessed light. relocating switches and gfci outlets · 61 m away
- 3305 Hampton RdApr 23, 202640 tunnel under home to replace lines · 71 m away
- 3307 Hampton RdMay 1, 2026Replace sewer yard line 80ft · 86 m away
- 821 Harris AveMar 12, 2026Replacement of complete existing central heat and air system with or without duct work · 88 m away
- 3217 Hampton RdJan 13, 2025I need to replaced the current 3/4 yard line for a 1 1/2 pvc pressure pipe. this is required so the homeowners can receive the occupancy certificate · 95 m away
- 3210 Hampton RdMar 20, 2025Replacement of an existing water heater remove existing gas water heater and install standard natural gas tank water heater · 97 m away
- 818 Harris AveDec 10, 2025I installed a new section of 1 black iron piping through the crawl space and tied it into the existing csst system. a new trunk line was routed throughout the home and extended to the underground 3/4 poly gas line leading to the exterior riser supplying the dryer. 818 harris avenue austin tx 78705 · 106 m away
- 3404 Hampton RdMar 23, 2026New irrigation system installation · 117 m away
- 719-1/2 Landon LnMar 11, 2013719 landon lane small project-retaining wall · 117 m away
- 3401 Hampton RdFeb 10, 2009Beau site, amended plat of the resubdivision of lots 15b-1 & 15b-2, block a, of — beau site; amended plat of the resubdivision of lots 15b-1 & 15b-2, block a, of the resubdivision of lot 15b of the resubdivision of lot 15 beau site and a portion of lot 14 · 120 m away
- 719 Landon LnSep 4, 2012719 landon lane · 136 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 138 m away