groundranger
Recent · latest filing Sep 2025Residential

719 Harris Ave

Austin, TX 78705

Duplex plumbing and electrical work at 719 Harris Ave

Permits indicate plumbing drain-line replacement and electrical service work at an existing duplex at 719 Harris Ave. The electrical permit was filed September 2, 2025, and the plumbing permit for drain work was filed September 19, 2025; an earlier permit covered water-heater replacement in November 2023.

Summarized from City of Austin records · updated Sep 19, 2025

Projects
3
3 filings
Latest filing
Sep 19, 2025
since Nov 16, 2023
Largest scope
—
Listed value
—

Where this project stands

Finaled

This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector

  1. AppliedSep 18, 2025
  2. IssuedSep 19, 2025
  3. WorkSep '25 – Apr '26
  4. Final inspectionApr 17, 2026

Passed final inspection Apr 17, 2026.

1 contact on this project · 1 phone number

Permit & project history

3 projects
  1. This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector

    This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Overhead service rebuild on duplex. two meters and two panels with 100-amp main breakers

    Overhead service rebuild on duplex. two meters and two panels with 100-amp main breakers

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 719 Harris Ave

What is happening at 719 Harris Ave in Austin?

City permits indicate plumbing and electrical work at an existing duplex, including drain-line replacement and an overhead electrical service rebuild. The latest related permit, 2025-119228 PP, was filed September 19, 2025.

Is a new building being built at 719 Harris Ave?

The records provided describe work at an existing duplex, not new construction at 719 Harris Ave. They include plumbing repairs and an electrical service rebuild.

What plumbing work is permitted at 719 Harris Ave?

Permit 2025-119228 PP, filed September 19, 2025, describes replacing cast-iron drain lines with PVC, with work involving both units. It also describes tunneling beneath the foundation and installing cleanouts.

What electrical work is planned at 719 Harris Ave?

Permit 2025-109983 EP, filed September 2, 2025, describes rebuilding the overhead electrical service at the duplex, with two meters and two panels with 100-amp main breakers.

Was a water heater replacement permitted at 719 Harris Ave?

Yes. Plumbing permit 2023-148055 PP, filed November 16, 2023, was for replacement of an existing water heater.

What is being repaired near Austin Independent School District at 3308 Hampton Rd?

Permits at 719 Harris Ave describe plumbing drain-line replacement and an electrical service rebuild at an existing duplex. The address is listed about 138 meters from Austin Independent School District at 3308 Hampton Rd.

Also being built nearby

All of 78705

More restaurants in 78705, townhomes in 78705.

Email me when a new permit is filed