715 Landon Ln
Austin, TX 78705
715 Landon Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 715 Landon Ln, Austin, TX 78705. The most recent, filed December 29, 2023, covers: “Install evse at garage”.
Compiled from City of Austin records · updated Dec 29, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 29, 2023
- since Dec 29, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse at garage
- AppliedDec 20, 2023
- IssuedDec 29, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 5, 2024
Passed final inspection Jan 5, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse at garage
Install evse at garage
City of Austin permitElectrical PermitFinal- Record
- 2023-162050 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 715 Landon Ln
What is being built at 715 Landon Ln?
The latest filing (City of Austin permit 2023-162050 EP, December 29, 2023) covers install evse at garage.
How many permits and filings does 715 Landon Ln have?
1 filing across 1 project, from December 29, 2023 to December 29, 2023.
Is there other construction near 715 Landon Ln?
Yes. Nearby filings include 711 Landon Ln (water line replacement from meter to home approximately 30 feet, Oct 13, 2025); 719 Landon Ln (719 landon lane, Sep 4, 2012); 3215 Fairfax Walk (herman pool, Jan 21, 2011).
How do I get alerts for new permits at 715 Landon Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 711 Landon LnOct 13, 2025Water line replacement from meter to home approximately 30 feet · 31 m away
- 719 Landon LnSep 4, 2012719 landon lane · 44 m away
- 3215 Fairfax WalkJan 21, 2011Herman pool · 45 m away
- 716 Landon LnMay 28, 2026Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 3212 Fairfax WalkJan 14, 2024New inground pool removal of 203 sq ft pavers and 43sf of steps · 60 m away
- 719-1/2 Landon LnMar 11, 2013719 landon lane small project-retaining wall · 65 m away
- 3203 Fairfax WalkMar 2, 2007Fairfax place subdivision — fairfax place subdivision · 81 m away
- 3206 Fairfax WalkSep 8, 2026Replacement of an existing water heater the water heater needs to be replaced as the current unit is no longer functioning efficiently · 91 m away
- 3204 Fairfax WalkJun 6, 202510 tunnel below the pier and beam access on left to replace remaining cast-iron drain lines. 44 trench thru yard to replace the water main · 105 m away
- 702 Landon LnFeb 17, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 horizontal gas system **furnace under the house · 109 m away
- 714 E 32nd StMay 1, 2026Express: replacement of 3 windows like for like · 111 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 115 m away