719 Landon Ln
Austin, TX 78705
719 Landon Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 719 Landon Ln, Austin, TX 78705. The most recent, filed September 4, 2012, covers: “719 landon lane”.
Compiled from City of Austin records · updated Sep 4, 2012
- Projects
- 1
- 1 filings
- Latest filing
- Sep 4, 2012
- since Sep 4, 2012
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 719 Landon Ln
What is being built at 719 Landon Ln?
The latest filing (City of Austin case 10800765, September 4, 2012) covers 719 landon lane.
How many permits and filings does 719 Landon Ln have?
1 filing across 1 project, from September 4, 2012 to September 4, 2012.
What is being built near Austin Independent School District in Austin?
719 Landon Ln is about 136 m from Austin Independent School District (3308 Hampton Rd). Its latest filing is for 719 landon lane.
Is there other construction near 719 Landon Ln?
Yes. Nearby filings include 719-1/2 Landon Ln (719 landon lane small project-retaining wall, Mar 11, 2013); 3215 Fairfax Walk (herman pool, Jan 21, 2011); 715 Landon Ln (install evse at garage, Dec 29, 2023).
How do I get alerts for new permits at 719 Landon Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 719-1/2 Landon LnMar 11, 2013719 landon lane small project-retaining wall · 21 m away
- 3215 Fairfax WalkJan 21, 2011Herman pool · 36 m away
- 715 Landon LnDec 29, 2023Install evse at garage · 44 m away
- 716 Landon LnMay 28, 2026Replacement of complete existing central heat and air system with or without duct work · 58 m away
- 711 Landon LnOct 13, 2025Water line replacement from meter to home approximately 30 feet · 75 m away
- 3203 Fairfax WalkMar 2, 2007Fairfax place subdivision — fairfax place subdivision · 90 m away
- 3212 Fairfax WalkJan 14, 2024New inground pool removal of 203 sq ft pavers and 43sf of steps · 103 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 107 m away
- 717 Harris AveMar 25, 2024Replace old fpe panel and meter can · 119 m away
- 3210 Hampton RdMar 20, 2025Replacement of an existing water heater remove existing gas water heater and install standard natural gas tank water heater · 125 m away
- 3206 Fairfax WalkSep 8, 2026Replacement of an existing water heater the water heater needs to be replaced as the current unit is no longer functioning efficiently · 126 m away
- 715 Harris AveJan 10, 2026New construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath · 126 m away