groundranger
Historic · latest filing Mar 2024Residential

717 Harris Ave

Austin, TX 78705

717 Harris Ave: 1 project on record

City of Austin lists 1 filing across 1 project at 717 Harris Ave, Austin, TX 78705. The most recent, filed March 25, 2024, covers: “Replace old fpe panel and meter can”.

Compiled from City of Austin records · updated Mar 25, 2024

Projects
1
1 filings
Latest filing
Mar 25, 2024
since Mar 25, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replace old fpe panel and meter can

  1. AppliedMar 20, 2024
  2. IssuedMar 25, 2024
  3. WorkMar '24 – Apr '24
  4. Final inspectionApr 22, 2024

Passed final inspection Apr 22, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replace old fpe panel and meter can

    Replace old fpe panel and meter can

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 717 Harris Ave

What is being built at 717 Harris Ave?

The latest filing (City of Austin permit 2024-034934 EP, March 25, 2024) covers replace old fpe panel and meter can.

How many permits and filings does 717 Harris Ave have?

1 filing across 1 project, from March 25, 2024 to March 25, 2024.

Is there other construction near 717 Harris Ave?

Yes. Nearby filings include 715 Harris Ave (new construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath, Jan 10, 2026); 719 Harris Ave (this option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector, Sep 19, 2025); 720 Harris Ave (harris avenue alley improvements, Sep 9, 2013).

How do I get alerts for new permits at 717 Harris Ave?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78705
Email me when a new permit is filed