717 Harris Ave
Austin, TX 78705
717 Harris Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 717 Harris Ave, Austin, TX 78705. The most recent, filed March 25, 2024, covers: “Replace old fpe panel and meter can”.
Compiled from City of Austin records · updated Mar 25, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 25, 2024
- since Mar 25, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplace old fpe panel and meter can
- AppliedMar 20, 2024
- IssuedMar 25, 2024
- WorkMar '24 – Apr '24
- Final inspectionApr 22, 2024
Passed final inspection Apr 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace old fpe panel and meter can
Replace old fpe panel and meter can
City of Austin permitElectrical PermitFinal- Record
- 2024-034934 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 717 Harris Ave
What is being built at 717 Harris Ave?
The latest filing (City of Austin permit 2024-034934 EP, March 25, 2024) covers replace old fpe panel and meter can.
How many permits and filings does 717 Harris Ave have?
1 filing across 1 project, from March 25, 2024 to March 25, 2024.
Is there other construction near 717 Harris Ave?
Yes. Nearby filings include 715 Harris Ave (new construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath, Jan 10, 2026); 719 Harris Ave (this option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector, Sep 19, 2025); 720 Harris Ave (harris avenue alley improvements, Sep 9, 2013).
How do I get alerts for new permits at 717 Harris Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 715 Harris AveJan 10, 2026New construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath · 17 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 19 m away
- 720 Harris AveSep 9, 2013Harris avenue alley improvements · 47 m away
- 716 Landon LnMay 28, 2026Replacement of complete existing central heat and air system with or without duct work · 65 m away
- 708 Harris AveMar 12, 2025Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 719 Carolyn AveNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 715 Carolyn AveMar 26, 2025Interior remodel of garage apartment adu · 112 m away
- 704 Harris AveMar 4, 2025New pool and concrete patio · 116 m away
- 719 Landon LnSep 4, 2012719 landon lane · 119 m away
- 3410 GreenwayDec 13, 2025Interior remodel - see attachments for full scope of work prewiring and fixtures 1 - flood light 1 - recess can in the front porch 2 - recess can back patio 2 - recess cans in the powder bath change foyer fixture to 4 - recess cans **adding level 2 ev charger to the remodel. revision: rewired all lights and change devices for receptacles · 120 m away
- 715 Landon LnDec 29, 2023Install evse at garage · 122 m away
- 719-1/2 Landon LnMar 11, 2013719 landon lane small project-retaining wall · 125 m away