719 Carolyn Ave
Austin, TX 78705
719 Carolyn Ave: 2 projects on record
City of Austin lists 2 filings across 2 projects at 719 Carolyn Ave, Austin, TX 78705. The most recent, filed November 19, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 19, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Nov 19, 2024
- since Nov 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedNov 6, 2024
- IssuedNov 19, 2024
- WorkNov '24 – Jan '25
- Final inspectionJan 23, 2025
Passed final inspection Jan 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-148334 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-111116 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 719 Carolyn Ave
What is being built at 719 Carolyn Ave?
The latest filing (City of Austin permit 2024-148334 MP, November 19, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 719 Carolyn Ave have?
2 filings across 2 projects, from November 19, 2024 to November 19, 2024.
Is there other construction near 719 Carolyn Ave?
Yes. Nearby filings include 715 Carolyn Ave (interior remodel of garage apartment adu, Mar 26, 2025); 720 Harris Ave (harris avenue alley improvements, Sep 9, 2013); 3501 Woodrow St (replacement of an existing water heater 3501 woodrow, Nov 26, 2024).
How do I get alerts for new permits at 719 Carolyn Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78705- 715 Carolyn AveMar 26, 2025Interior remodel of garage apartment adu · 36 m away
- 720 Harris AveSep 9, 2013Harris avenue alley improvements · 65 m away
- 3501 Woodrow StNov 26, 2024Replacement of an existing water heater 3501 woodrow · 65 m away
- 3410 GreenwayDec 13, 2025Interior remodel - see attachments for full scope of work prewiring and fixtures 1 - flood light 1 - recess can in the front porch 2 - recess can back patio 2 - recess cans in the powder bath change foyer fixture to 4 - recess cans **adding level 2 ev charger to the remodel. revision: rewired all lights and change devices for receptacles · 70 m away
- 708 Harris AveMar 12, 2025Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 3507 Woodrow StJun 9, 2026Replacement of complete existing central heat and air system with or without duct work like for like: 2 ton horizontal gas system (upstairs) · 106 m away
- 717 Harris AveMar 25, 2024Replace old fpe panel and meter can · 106 m away
- 715 Harris AveJan 10, 2026New construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath · 107 m away
- 705 Carolyn AveSep 19, 2024Replacement of complete existing central heat and air system with or without duct work · 112 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 116 m away
- 704 Harris AveMar 4, 2025New pool and concrete patio · 120 m away
- 3505 GreenwayAug 6, 2026Addition and remodel of existing non-conplying sfr. replacement of existing sideing windowsm and exterior doors. remodel of front entry porch primary bedroom and bathroom and covered porch. addition to existing noncomplying carport. addition to the 2nd floor ovobe the carpot. rainwater cpllection system as required by the boa · 120 m away