3410 Greenway
Austin, TX 78705
Interior remodel and Level 2 EV charger at 3410 Greenway
City of Austin permits indicate an interior remodel at 3410 Greenway, with a building permit filed July 15, 2025. Plumbing and electrical permits followed in November and December; the electrical scope includes a Level 2 EV charger and lighting and receptacle work.
Summarized from City of Austin records · updated Dec 13, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Dec 13, 2025
- since Mar 31, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInterior remodel - see attachments for full scope of work prewiring and fixtures 1 - flood light 1 - recess can in the front porch 2 - recess can back patio 2 - recess cans in the powder bath change foyer fixture to 4 - recess cans **adding level 2 ev charger to the remodel. revision: rewired all lights and change devices for receptacles
- AppliedMay 28, 2025
- IssuedDec 13, 2025
- WorkDec '25 – Jun '26
- Final inspectionJun 25, 2026
Passed final inspection Jun 25, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projectsInterior remodel - see attachments for full scope of work prewiring and fixtures 1 - flood light 1 - recess can in the front porch 2 - recess can back patio 2 - recess cans in the powder bath change foyer fixture to 4 - recess cans **adding level 2 ev charger to the remodel. revision: rewired all lights and change devices for receptacles
Interior remodel - see attachments for full scope of work prewiring and fixtures 1 - flood light 1 - recess can in the front porch 2 - recess can back patio 2 - recess cans in the powder bath change foyer fixture to 4 - recess cans **adding level 2 ev charger to the remodel. revision: rewired all lights and change devices for receptacles
City of Austin permitElectrical PermitFinal- Record
- 2025-079213 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel - see attachments for full scope of work
Interior remodel - see attachments for full scope of work
City of Austin permitPlumbing PermitFinal- Record
- 2025-079213 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater replace 2 gas water heaters will new
Replacement of an existing water heater replace 2 gas water heaters will new
City of Austin permitPlumbing PermitWithdrawn- Record
- 2025-141879 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel - see attachments for full scope of work
Interior remodel - see attachments for full scope of work
City of Austin permitBuilding PermitFinal- Record
- 2025-079213 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Upgrade 200amp ug service and replace interior sub panel
Upgrade 200amp ug service and replace interior sub panel
City of Austin permitElectrical PermitExpired- Record
- 2025-037322 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3410 Greenway
What is being built at 3410 Greenway in Austin?
City of Austin permits indicate an interior remodel, not a new building. The electrical work includes a Level 2 EV charger.
When was the remodel at 3410 Greenway permitted?
The building permit, 2025-079213 BP, was filed July 15, 2025. Related plumbing and electrical permits were filed November 5 and December 13, 2025.
What work is included in the 3410 Greenway permits?
The records describe an interior remodel, plumbing work, lighting and receptacle changes, and a Level 2 EV charger. The detailed remodel scope is referenced in attachments not included in the record.
Is an EV charger being installed at 3410 Greenway?
The December 13, 2025 electrical permit, 2025-079213 EP, includes adding a Level 2 EV charger as part of the remodel.
What permits were filed at 3410 Greenway near Austin Independent School District?
The address is about 159 meters from Austin Independent School District at 3308 Hampton Road. The City of Austin records show building, plumbing, and electrical permits for an interior remodel at 3410 Greenway.
Also being built nearby
All of 78705- 719 Carolyn AveNov 19, 2024Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 720 Harris AveSep 9, 2013Harris avenue alley improvements · 75 m away
- 3404 Hampton RdMar 23, 2026New irrigation system installation · 76 m away
- 3505 GreenwayAug 6, 2026Addition and remodel of existing non-conplying sfr. replacement of existing sideing windowsm and exterior doors. remodel of front entry porch primary bedroom and bathroom and covered porch. addition to existing noncomplying carport. addition to the 2nd floor ovobe the carpot. rainwater cpllection system as required by the boa · 86 m away
- 715 Carolyn AveMar 26, 2025Interior remodel of garage apartment adu · 106 m away
- 3509 GreenwayJan 4, 2026Outdoor shower in backyard stall will be approx 4ft x 7ft x 7 ft tall so about 30 sq ft in area. pan drain will be connected so gray water goes to large perforated pvc pipe over french drain. shower water will come from two existing outside spigots connected using washer/dryer protected/braided hoses and will be disconnected and drained over winter freezes. i have verbally cleared the gray water to french drain with residential building inspections that my property is not in a gray water restricted area so it is okay. also verbally cleared with residential zoning department -- both departments informed me i only need a standalone residential permit since i am the homeowner · 115 m away
- 719 Harris AveSep 19, 2025This option is going to include performing a tunnel underneath the foundation on the left side of the home. we will tunnel underneath the restroom for unit a and also the kitchen area and will be redoing with new pvc and will bring out the pvc to the left side of the home and will tie back in to the pvc line that is located on that left side. this is going to take care of the cast-iron for units a. we will bring out the laundry for the two units out the left side and will be tying them in to the main drain system that runs down the left-hand side of the home. then we will go from the back of unit b and well have to cut two access holes in the back deck to be able to get underneath the foundation and expose the kitchen and toilet drain and will be redoing with pvc and will tie on to the existing pvc that is located under home. we are going to be canceling out the cast-iron line that runs about 80 feet across the two units. once we have all the pvc set in place we will strap to foundation to prevent any movement in the future and will thoroughly test once we are completed. we are going to install new clean out accesses for each of the fixtures and will also strap the plumbing to the bottom of the foundation to prevent any movement in the future. once this is all completed we will have an engineer on site to perform inspection of the tunnel as well as a city inspector · 119 m away
- 717 Harris AveMar 25, 2024Replace old fpe panel and meter can · 120 m away
- 3501 Woodrow StNov 26, 2024Replacement of an existing water heater 3501 woodrow · 129 m away
- 715 Harris AveJan 10, 2026New construction accessory to primary use 2-story accessory structure with 1 bedroom and 1 bath · 130 m away
- 818 Harris AveDec 10, 2025I installed a new section of 1 black iron piping through the crawl space and tied it into the existing csst system. a new trunk line was routed throughout the home and extended to the underground 3/4 poly gas line leading to the exterior riser supplying the dryer. 818 harris avenue austin tx 78705 · 131 m away
- 3401 Hampton RdFeb 10, 2009Beau site, amended plat of the resubdivision of lots 15b-1 & 15b-2, block a, of — beau site; amended plat of the resubdivision of lots 15b-1 & 15b-2, block a, of the resubdivision of lot 15b of the resubdivision of lot 15 beau site and a portion of lot 14 · 131 m away